Planning Permission Ireland
InvalidApartmentsDecided 6 January 2022

Site of c. 0.568 hectares at 97, Abbey Street Middle, Dublin 1; 16/17 Prince's Street North;the area previously known as Nos. 19/25 Prince's Street North, Dublin 1;the "Arnotts' Car Park", with an address of No.98-101 Middle Abbey Street, Dublin 1 etc.

A 155-unit Build-To-Rent apartment development in Dublin 1, involving partial demolition of the Arnotts' Car Park.

4149/21 · Dublin City Council · Lodged 22 December 2021

Reference
4149/21
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
22 December 2021

Summary

AI-generated

The proposed development consists of a Build-To-Rent residential scheme of 155 apartments. It involves the demolition of a three-storey Eircom structure and the top three levels of the Arnotts' Car Park, followed by the construction of a 12-storey over basement element and extensions above the remaining car park and Arnotts Store.

Apartmentsbuild to rentapartmentsdemolitioncity centre
Residential units
155
Storeys
12

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development at a site of c. 0.568 hectares at 97, abbey street middle, dublin 1; 16/17 prince's street north, dublin 1; the area previously known as nos. 19/25 prince's street north, dublin 1;the "arnotts' car park", with an address of nos. 98-101 middle abbey street, dublin 1 and the associated roof of the car park over arnotts store at nos. 102-107 middle abbey street, dublin 1; nos. 2-3, 4 and 4a proby's lane, dublin 1; and nos. 7/7a and 8 liffey street upper, dublin
  • The proposed development will consist of the development of a build-to-rent residential development consisting of the: -demolition of the existing 3 no. Storey eircom structure to the rear of no. 97 middle abbey street (c. 2.201 sq. M); -decommissioning and demolition of the top three open-air levels of the arnotts' car park (resulting in the removal of 145 no. Car parking spaces, with 225 no. Car parking spaces remaining); -development of a 12 no. Storey over basement element fronting william's lane, a 5 no. Storey element above arnotts' car park, and 2 no. Storey element above arnotts store, to provide 155 no. Apartments (56 no. Studio units, 85 no. 1-bed units; and 14 no. 2-bed units). The development also provides for hard and soft landscaping including the provision of a landscaped public plaza (including bicycle parking) along the william's lane frontage; a landscaped communal courtyard as well as a communal terrace and private terraces on the southern elevation all at sixth floor level; a landscaped communal courtyard as well as private terraces at the southern elevation, communal terraces at the southern elevation and part of the western elevation, and outdoor exercise area and basketball court at the northern elevation all at seventh floor level; and terraces on the eastern and western elevations of the eleventh floor level. Private open space in the form of terraces are also provided on the east-facing, west-facing and south-facing elevations of the two courtyards at sixth and seventh floor levels, juliette balconies are also proposed on the eastern, western, southern elevations as well as the east-facing, west-facing and south-facing elevations of the two courtyards. Pedestrian access to this part of the development will be provided via william's lane. Additional proposed works include the provision of: communal residential amenities (c. 459 sq. M) (including co-working space, toilets, multimedia room, gyms and exercise studios, dog washing room, private dining, storage hire, multi-purpose space and communal lounge); residential support facilities (c. 471 sq. M) (including entrance foyer and concierge, post room, bicycle storage and bicycle repair station, maintenance rooms/ management stores, general storage and bin store); communal amenity open spaces; a substation and a switch room (c. 30 sq. M); water tank and sprinkler rooms (c. 117 sq. M); sustainable urban drainage systems (including green roofs and attenuation tanks (c. 121 sq. M); and plant at basement level. The total gross floor area of this part of the development is c. 12,766 sq. M. The development will also consist of the following works to no. 97 middle abbey street comprising the: -demolition of part of the existing basement (c. 16 sq. M) and the existing rear extensions (second and third floor levels) (c. 11 sq. M); -change of use of the basement floor level from retail (storage) to café (storage) (c. 112 sq. M); - continued use of the ground floor level as a café (c. 89 sq. M) -change of use of the first, second, third and fourth floor levels to provide 4 no. Build-to-rent studio apartment units (one on each level) (which will be operationally linked to the 155 no. Apartments scheme); -and associated internal and external alterations to the building. Pedestrian access to this part of the development will be provided via middle abbey street. The total gross floor area of this part of the development is c. 423 sq. M. The development will also consist of: associated lighting; associated signage; associated hard and soft landscaping; and all other associated site excavation, infrastructural and site development works above and below ground including changes in level, boundary treatments and associated site servicing (foul and surface water drainage and water supply) the development will consist of the extension of the opening hours of the existing multi-storey car park ('arnotts' car park') from its current operating hours of: monday-wednesday (07:00
  • 20:00); thursday (07:00
  • 21:00); friday - saturday (07:00
  • 20:00); and sunday (09:00
  • 20:00) to the operation of the car park on a 24 hours per day, 7 days per week basis for a temporary period of 5 years

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 1, 94 Middle Abbey St, Dublin 1May 2026€2,000,00053 m
84 Middle Abbey Street, Dublin 1May 2025€1,000,000117 m
303 The Lotts, Bachelors Walk, Dublin 1Dec 2025€250,000119 m
Apt 336, Bachelors Walk, Dublin 1Dec 2025€280,000119 m
324 Bachelors Walk, Dublin 1Jul 2025€290,000119 m
319 Bachelors Walk, Dublin 1, DublinJul 2025€265,000123 m
219 Bachelors Walk Apts, Dublin 1Oct 2025€254,000124 m
Apt 215 Bachelors Walk, Norths Lotts, Dublin 1Jul 2026€257,000126 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 December 2021
  2. Decision due24 February 2022
  3. Decision issued6 January 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.