Planning Permission Ireland
GrantedCommercialDecided 22 May 2023

97 Middle Abbey St & 16/17 Prince's Street North, 19/25 Prince's Street North & 98-101 Middle Abbey Street & 102-107 Middle Abbey Steet & 2-3, 4 & 4A Proby's Lane & 7/7A and 8 Liffey Street Upper, Dublin 1.

Demolition of structures and partial car park to build a hotel near Middle Abbey Street.

4880/22 · Dublin City Council · Lodged 19 September 2022

Reference
4880/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
19 September 2022

Summary

AI-generated

Fitzwilliam Real Estate Developments Ltd intends to apply for permission for a hotel development. The project involves the demolition of an existing 3-storey Eircom structure, rear extensions, and the top three levels of the Arnotts' car park to construct a 9-storey over basement building.

Commercialhoteldemolitioncity centre
Storeys
9

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Fitzwilliam real estate developments ltd intends to apply for permission for development at this site of c. 0.555 hectares at: no. 97 middle abbey street, dublin 1; 16/17 prince's street north, dublin 1; the area previously known as nos. 19/25 prince's street north, dublin 1; the 'arnotts' car park', with an address of nos. 98-101 middle abbey street, dublin 1 and the associated roof of the car park over arnott's store at nos. 102-107 middle abbey street, dublin 1; nos. 2-3, 4 and 4a proby's lane, dublin 1; and nos. 7/7a and 8 liffey street upper, dublin
  • The proposed development will consist of a hotel development consisting of the: demolition of the existing 3 no. Storey eircom structure to the rear of no. 97 middle abbey street (c. 2,201 sq m), rooftop stairwell enclosures (c. 128 sq m) and of the existing rear extensions no. 97 middle abbey street (second and third floor levels) (c. 11sq m) decommissioning and demolition of the top three open-air levels of the arnotts' car park (resulting in the removal of 145 no. Car parking spaces, with 225 no. Car parking spaces remaining); development of a 9 no. Storey (with setbacks) over basement element fronting william's lane, a 3 no. Storey (with setbacks) element above arnotts' car park and 2 no. Storey (with setback) element above arnotts store, to provide hotal (254 no. Bedrooms and related ancillary hotel facilities and restaurant uses (including reception area, lobby, public bar, restaurant, cold room, storage areas, administration and staff facilities, plant, refuse area and bicycle parking area) with a total new build gross floor of c. 10,689 sq m (including c. 632 sq m basement, and esb substation with switchrooms); and the change of use (from basement to fourth floor levels to hotel), refurbishment (internal and external alterations) and extension (to link with the new build hotel in the rear) of no. 97 middle abbey street (total floor area of c. 404 sq m (including c. 124 sq m basement); the continued use of the arnotts' car park stairs (ground, first, second and their floor levels) and arnotts' store stairs (ground, first, second, third, fourth and fifth floor levels) (c. 205 sq m and c. 142 sq m respectively); associated lighting, pedestrian access via no. 97 middle abbey street and william's lane; sustainable urban drainage systems (including green roofs and attenuation tanks; associated site servicing (foul and surface water drainage and water supply); associated hard and soft landscaping and all other associated site excavation, infrastructural and site development works above and below ground including changes in level, boundary treatments and associated site servicing (foul and surface water drainage and water supply). The total gross floor area of the overall development is c. 11,440 sq m. The development will also consist of : the erection of no. Side-lit signs, 1 no. On the south elevation (entrance to no. 97 middle abbey street) and 1 no. On the east elevation (william's lane) measuring c. 0 49 sq m each

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 1, 94 Middle Abbey St, Dublin 1May 2026€2,000,00053 m
84 Middle Abbey Street, Dublin 1May 2025€1,000,000117 m
303 The Lotts, Bachelors Walk, Dublin 1Dec 2025€250,000119 m
Apt 336, Bachelors Walk, Dublin 1Dec 2025€280,000119 m
324 Bachelors Walk, Dublin 1Jul 2025€290,000119 m
319 Bachelors Walk, Dublin 1, DublinJul 2025€265,000123 m
219 Bachelors Walk Apts, Dublin 1Oct 2025€254,000124 m
Apt 215 Bachelors Walk, Norths Lotts, Dublin 1Jul 2026€257,000126 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received19 September 2022
  2. Decision due23 May 2023
  3. Decision issued22 May 2023
  4. Permission expiry13 August 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.