Planning Permission Ireland
GrantedAlterationsDecided 10 December 2018

76, Thomas Street, Dublin 8

Fire safety upgrades, smoke damage cleaning, and internal alterations to a protected structure.

4173/18 · Dublin City Council · Lodged 16 October 2018

Reference
4173/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
16 October 2018

Summary

AI-generated

The application seeks permission for extensive fire safety upgrades and restoration works to a protected structure. Works include cleaning smoke damage, replacing ceilings with fire-rated plasterboard, upgrading timber doors, installing fire-rated glazed lobby screens, and replacing basement steps.

Alterationsprotected structurefire safetyrestoration

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: planning permission for clean existing surfaces of smoke damage internally, remove non-original fittings, remove non-original doorset from entrance lobby, provide new glazed lobby within ground floor room to improve fire safety of upper floor occupants, replace the existing plasterboard ceiling to ground floor with new fire rated plasterboard ceiling after the replacement of electrical installation, upgrade fire rating of original panelled timber doors, remove non-original blocked opening to rear of ground floor and replace with new double-glazed timber screen, remove non-original timber steps accessing the basement with new timber steps in original location to rear with external timber framed enclosure with slate finish, provide fire rated glazed lobby screens to first and second floor landings to improve fire safety standard, including partial relocation of door to rear rooms, fire rate remaining upper floors using 'rockwool flexi' fitted between joists after services installation is completed, provide fire rated curtain to attic space above line of staircase enclosure for fire separation requirements, clean staining to granite facade (particularly above ground floor windows), replacement of mechanical and electrical services, redecorate on completion with breathable paint to external walls. Repair of glazed pavement light to thomas st. And associated site works at 76 thomas st, dublin 8, a protected structure.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 16 August 2019.

Notified floor area: 373.08

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
83 Bertram Court, Cornmarket, Dublin 8Jan 2025€340,00042 m
Apt 8, Bank House, Cornmarket Dublin 8Feb 2025€377,50046 m
87 Bertram Court, Christchurch, Dublin 8Jun 2026€360,00048 m
Apt 1, 84 Thomas St, Dublin 8Apr 2025€1,180,00052 m
Apartment 3, 86/87 Thomas Street, Dublinnot full market priceJul 2025€360,00055 m
71 Bertram Court, Christchurch, Dublin 8Jan 2026€350,00059 m
61 Bertram Court, Christchurch, Cornmarket Dublin 8Jun 2026€340,00059 m
130 Bertram Court, Dublin 8, DublinMay 2026€255,00082 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received16 October 2018
  2. Further information received13 November 2018
  3. Decision due10 December 2018
  4. Decision issued10 December 2018
  5. Grant issued24 January 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.