Planning Permission Ireland
GrantedApartmentsDecided 10 December 2019

17, Anglesea Road, Ballsbridge, Dublin 4

Reconfiguration and extension of a building in Ballsbridge to reduce the number of apartments from five to four.

4224/19 · Dublin City Council · Lodged 16 October 2019

Reference
4224/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
16 October 2019

Summary

AI-generated

The project involves the demolition of an existing rear extension and the construction of a new single-storey extension. It includes internal and external alterations, a first-floor balcony, and a new rear dormer window to convert the building from five apartments into four larger units.

Apartmentsapartmentsrenovationextension
Residential units
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission for the extension and reconfiguration of no. 17 anglesea road, ballsbridge, dublin 4 which shall comprise demolition of the existing rear extension, construction of a new single-storey extension, internal and external alterations, (including a balcony at first floor level and a new dormer window to the rear) and associated works to convert the building from currently comprising of 5 apartments (3 one-beds and 2 studios) to comprising of 4 apartments (2 two-beds and 2 one-beds).

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 70 The Cedars, Herbert Park Lane, Ballsbridge Dublin 4Dec 2025€640,000202 m
51 The Cedars, Herbert Park Lane, Ballsbridge Dublin 4Mar 2025€475,000202 m
30 The Cedars, Park Lane, Herbert Park Dublin 4Apr 2026€815,000212 m
22 The Cedars, Herbert Park Lane, BallsbridgeDec 2025€647,500212 m
11 Cedars, Herbert Park, Ballsbridge Dublin 4Dec 2025€802,999212 m
7 Simmonscourt Rd, Ballsbridge, Dublin 4Mar 2025€547,000221 m
7a Simmonscourt, Simmonscourt Rd, BallsbridgeMar 2025€391,000221 m
63 Simmonscourt Sq, Ballsbridge, Dublin 4Apr 2026€545,000233 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received16 October 2019
  2. Decision due10 December 2019
  3. Decision issued10 December 2019
  4. Grant issued24 January 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.