St. Mary's Church, Anglesea Road, Ballsbridge, Dublin 4, D04 TV26
Change of use of St. Mary's Church to a hospitality, events, and community venue for the RDS.
5001/22 · Dublin City Council · Lodged 7 October 2022
- Reference
- 5001/22
- Authority
- Dublin City Council
- Register status
- Decided
- Type
- Permission
- Received
- 7 October 2022
Summary
AI-generatedPermission is sought for alterations and change of use of St. Mary's Church, a protected structure, to accommodate hospitality, events, community uses, and exhibitions. Works include internal structural ties, toilet upgrades, reopening an original door, boundary wall modifications, and temporary marquee structures.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
Protected structure: the development will consist of alterations to, and change of use of, st. Mary's church (a protected structure, ref. No. 131) to accommodate hospitality activities, events, community uses, meetings and exhibitions, and provide incidental space ancillary to the overall use of the royal dublin society. Proposed internal alterations to the church building comprise the removal of an existing blockwork interior wall, installation of structural horizontal ties at a high level within the nave, upgrades to the existing toilets and facilities and reopening of an original entrance door to the north transept. Proposed external works include repairing existing site railing and gates, regarding and replacing finishes to existing car parking areas to include modifications to levels and surface drainage; provision of 4 no. Gate openings in the boundary wall to the north facilitating connections between the church and the royal dublin society; removal of trees to facilitate development; tree planting and landscaping works to church grounds and ancillary works. Permission is also sought for the placement of up to 3 no. Temporary marquee structures (comprising a total of c. 690sq. M and of c. 4m in height) within the curtilage of the church for uses associated with events taking places at the royal dublin society and the church.
Land-use zoning
What this land is zoned for
“To protect the existing architectural and civic design character, and to allow only for limited expansion consistent with the conservation objective.”
National zoning type: General
Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 13 July 2023. A completion certificate was lodged on 17 May 2024.
Notified floor area: 539.5 m²
3 commencement notices are linked to this development.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 7 Simmonscourt Rd, Ballsbridge, Dublin 4 | Mar 2025 | €547,000 | 96 m |
| 7a Simmonscourt, Simmonscourt Rd, Ballsbridge | Mar 2025 | €391,000 | 96 m |
| 10 Simmonscourt Rd, Ballsbridge, Dublin 4 | Mar 2025 | €561,000 | 114 m |
| 10a Simmonscourt, Simmonscourt Rd, Ballsbridge | Mar 2025 | €401,000 | 114 m |
| 70 Simmonscourt Sq, Ballsbridge, Dublin 4 | Apr 2026 | €550,000 | 117 m |
| 72 Simmonscourt Sq, Ballsbridge, Dublin 4 | Apr 2026 | €560,000 | 117 m |
| 63 Simmonscourt Sq, Ballsbridge, Dublin 4 | Apr 2026 | €545,000 | 117 m |
| 12 Simmonscourt Rd, Ballsbridge, Dublin 4 | Aug 2025 | €1,200,000 | 131 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received7 October 2022
- Decision due22 March 2023
- Decision issued22 March 2023
- Permission expiry16 June 2028
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted60 m away
Planning permission is sought for the demolition of an existing bungalow and replacement with a new two…
1, Simmonscourt Castle, Simmonscourt Road, Dublin 4, D04 H1W7
3273/19Dublin CityLodged 17 Jun 2019New dwelling
- Invalid60 m away
Permission is sought for the demolition of an existing bungalow and replacement with a new two storey…
1, Simmonscourt Castle, Simmonscourt Road, Dublin 4, D04 H1W7
3054/19Dublin CityLodged 21 May 2019New dwelling
- Granted90 m away
The development will consist of: a) the demolition of the existing rear single-storey extension; b) the…
43, Anglesea Road, Ballsbridge, Dublin 4
WEB1668/21Dublin CityLodged 18 Jun 2021Extension
- Granted90 m away
Planning permission for development comprising the construction of a single storey, flat-roofed extension to…
18 Simmonscourt, Simmonscourt Road, Dublin 4, D04 E1H7
3023/21Dublin CityLodged 24 Jun 2021Extension
- Granted90 m away
Permission is sought for the demolition of the existing rear single-storey extension and conservatory and the…
57, Anglesea Road, Ballsbridge, Dublin 4 D04 H7T2
WEB1336/23Dublin CityLodged 20 Apr 2023Extension
- Granted100 m away
Application for Planning Permission for development to consist of the demolition of the existing single…
59, Anglesea Road, Ballsbridge, Dublin 4 D04 C9X2
WEB1760/20Dublin CityLodged 2 Nov 2020Extension
- Granted120 m away
PROTECTED STRUCTURE: The development will consist of the redevelopment of the Anglesea Stand to provide a new…
Site within the overall RDS Lands, Ballsbridge, Dublin 4
3144/18Dublin CityLodged 30 May 2018Other
- Granted130 m away
Planning permission for the extension and reconfiguration of No. 17 Anglesea Road, Ballsbridge, Dublin 4…
17, Anglesea Road, Ballsbridge, Dublin 4
4224/19Dublin CityLodged 16 Oct 2019Apartments
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedAlterations
PROTECTED STRUCTURE: We, St Mary’s Pro-Cathedral Parish on behalf of the Schools and Parishes of the Diocese…
Saint Mary's Pro-cathedral, Marlborough Street, Dublin 1, D01 DK83
WEB2684/25Dublin CityLodged 25 Jun 2025
- GrantedAlterations
PROTECTED STRUCTURE: the development will consist of: (a) to the north of the existing building facing Mary…
The Church Bar and Restaurant, Mary Street, Dublin 1.
3476/19Dublin CityLodged 12 Jul 2019
- GrantedAlterations
PROTECTED STRUCTURE: Permission for development at the The Church of The Immaculate Heart of Mary, a…
Church Of The Immaculate Heart Of Mary, 10-12 City Quay, Dublin 2
3194/20Dublin CityLodged 13 Aug 2020
- InvalidAlterations
PROTECTED STRUCTURE: We, Parish of The Immaculate Heart of Mary, intend to apply for permission for…
Church Of The Immaculate Heart Of Mary, City Quay, Dublin 2
WEB6092/25Dublin CityLodged 22 Dec 2025
- GrantedAlterations
Work on St. Marys Church, protected structure reg. no. MH047-214, NIAH no. 14331007, Located within and…
Enfield Rd. , Longwood , Co. Meath
TA171340MeathLodged 20 Nov 2017
- GrantedCommercial
The construction of a single storey, circa 190m2 in size, parish pastoral centre, with rendered wall finish,…
Mill Street , Maynooth , Co. Kildare
16485KildareLodged 11 May 2016
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.