ESB lands, south of Kylemore Way, and north west of the existing ESB Networks premises, Kylemore Way, Dublin 8
Construction of a 30 MW battery storage facility with a control building and 34 battery containers.
4282/19 · Dublin City Council · Lodged 23 October 2019
- Reference
- 4282/19
- Authority
- Dublin City Council
- Register status
- Decided
- Type
- Permission
- Received
- 23 October 2019
Summary
AI-generatedThe development consists of a 30 MW capacity battery storage facility within a secured compound. It will include a 279 sq.m. control building, up to 34 battery container units, transformers, inverters, lightning masts, and security cameras.
- Floor area
- 279 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
The development will consist of a c. 30 mw capacity battery storage facility within a secured compound and will – subject to detailed design, commercial and technical considerations, include the following elements: (a) a control building (c. 279 sq. M. , c. 4.7m high); (b) plant and equipment comprising: (1) up to 34 no. Battery container units (c. 30 sq. M. And up to c. 4.7m high) with roof mounted hvacs; (2) up to 17 no. Battery unit transformers on concrete plinths (c. 10.6 sq. M. And c. 4m high); (3) up to 17 no. Inverter units (c. 30 sq. M. And c. 3 m high); (4) a bunded transformer (c. 66 sq. M. And c. 6 m high) with firewall on one side; (5) a bunded house transformer (c. 20 sq. M. And c. 3 m high) surrounded on three sides by a 3m high firewall; (6) var support system on a concrete plinth (c. 24 sq. M. And c. 3.4 m high); (7) cable trays and associated service connections; (8) other ancillary electrical plant; (9) up to 5 no. Lightning masts (c. 20 m high); (10) a c. 18 m high scada pole; (11) pole mounted security cameras (c. 8.3 m high); (c) c. 2.6 m high palisade fencing and gates; and (d) ancillary site clearance and developments works including provision of areas of hardstanding, internal access roads, and connections to site services networks. Primary access will be via the existing access location from kylemore way road, to the north of the site. Secondary access, if required in exceptional circumstances, will be via an existing internal access to the east between the development site and the abutting esb owned 110 kv and 220 kv substation compound. Planning permission is being sought for a duration of 10 years.
Land-use zoning
What this land is zoned for
“To provide for the creation and protection of enterprise and facilitate opportunities for employment creation.”
National zoning type: Industrial, enterprise, employment
Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 28 June 2021. A completion certificate was lodged on 3 February 2022.
Notified floor area: 46 m²
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 27 Millrose Est, Bluebell Ave, Bluebell Dublin 12 | Apr 2025 | €328,000 | 319 m |
| 1 Hollybrook, Bluebell Avenue, Bluebellnot full market price | Apr 2025 | €320,000 | 337 m |
| 101 Jamestown Rd, Inchicore, Dublin 8 | Oct 2025 | €436,000 | 422 m |
| 66 La Touche Rd, Dublin 12, Dublin | Jan 2025 | €500,000 | 424 m |
| 309 Landen Rd, Ballyfermot, Dublin 10 | Apr 2025 | €308,000 | 441 m |
| 56 La Touche Rd, Bluebell, Dublin 12 | Feb 2025 | €370,000 | 452 m |
| 91 Jamestown Rd, Inchicore, Dublin 8 | Apr 2025 | €415,000 | 452 m |
| 29 La Touche Drive, Bluebell, Dublin 12 | Jan 2025 | €290,000 | 457 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received23 October 2019
- Decision due17 December 2019
- Decision issued13 December 2019
- Grant issued28 January 2020
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted120 m away
The proposed development will consist of a battery energy storage system (BESS) located within a fenced…
a c. 1.7 ha site located within the ESB Inchicore substation site, specifically lands south of Kylemore Way and northwest of the existing ESB Substation, Kylemore Way, Dublin 8, D08 E398 and to the immediate west of the Kylemore BESS, Kylemore Road, Dubli
WEB2226/25Dublin CityLodged 30 May 2025Energy
- Granted130 m away
The development will consist of a synchronous condenser, this will be located within a fenced compound of c.…
ESB Inchicore Depot-specifically lands, south of Kylemore Way, and northwest of the existing, ESB premises, Kylemore Way, Dublin 8, D08 E398
4350/22Dublin CityLodged 29 Jun 2022Energy
- Invalid210 m away
The proposed development will facilitate the change of use of the existing Metal Resource Recycling Facility…
2 Kylemore Business Park, Jamestown Road, Kylemore Way, Dublin 8, D08 WK81
3208/21Dublin CityLodged 23 Jul 2021Change of use
- Granted210 m away
Planning permission for the proposed development will facilitate the change of use of the existing metal…
2 Kylemore Business Park, Jamestown Road, Kylemore Way, Dublin 8, D08 WK81
3289/21Dublin CityLodged 6 Aug 2021Change of use
- Granted290 m away
PERMISSION & RETENTION: Swarco Ireland Limited are seeking Planning Permission of 2 No. New Windows on the…
Essmore House, Kylemore Business Park, Kylemore Way, Dublin 8
WEB5569/25Dublin CityLodged 31 Oct 2025Retention
- Granted290 m away
The development will consist of a proposed external hardstanding area for storage purposes located to the…
Laydex Ltd, Unit 3, Allied Industrial Estate, Kylemore Road, Inchicore, Dublin 10, D10PY54
3373/21Dublin CityLodged 23 Aug 2021Industrial
- Granted310 m away
RETENTION: Two-storey light industrial/ warehouse unit attached to the south side of the main building (Plan…
Unit 5, St. Jamestown Busines Park, Kylemore Way, Dublin 8
2447/19Dublin CityLodged 8 Mar 2019Retention
- Refused330 m away
The development will consist of the change of use of a detached single storey mono pitched roof shed building…
3, Canal Terrace, Bluebell, Dublin 12, D12 X20V
3132/20Dublin CityLodged 4 Aug 2020New dwelling
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedEnergy
The development will consist of a c. 30 MW capacity battery storage facility within a secured compound on a…
Lands to the north of South Bank Road, Ringsend, Dublin 4
3373/18Dublin CityLodged 26 Jun 2018
- GrantedEnergy
Permission for a ten year planning permission is being sought for the proposed development which will consist…
Knockmurry , Castlerea , Co. Roscommon.
2560487RoscommonLodged 14 Oct 2025
- Awaiting decisionEnergy
Permission for 1 no. enclosed battery energy storage system compound on a total of c. 2 hectare site, to…
Ballynanelagh Knockraha Co Cork
24/6103corkLodged 6 Nov 2024
- GrantedEnergy
Will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to…
a c. 4.63 ha site within the former Lough Ree Power (LRP) Station , in the townlands of Aghamore and Lanesborough , Lanesborough (Lanesboro) Co. Longford
2460315LongfordLodged 19 Dec 2024
- Awaiting decisionEnergy
A 10 year planning permission on a site of approximately 4.9 hectares is sought. The development will consist…
Derrynagall or Ballydaly , Tullamore , Co. Offaly
2660248OffalyLodged 5 May 2026
- Awaiting decisionEnergy
Permission for — 1no. enclosed battery energy storage system compound on a total of c. 2-hectare site, to…
Ballynanelagh Knockraha Co. Cork
25/4155corkLodged 7 Feb 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.