Planning Permission Ireland
GrantedEnergyDecided 13 December 2019

ESB lands, south of Kylemore Way, and north west of the existing ESB Networks premises, Kylemore Way, Dublin 8

Construction of a 30 MW battery storage facility with a control building and 34 battery containers.

4282/19 · Dublin City Council · Lodged 23 October 2019

Reference
4282/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
23 October 2019

Summary

AI-generated

The development consists of a 30 MW capacity battery storage facility within a secured compound. It will include a 279 sq.m. control building, up to 34 battery container units, transformers, inverters, lightning masts, and security cameras.

Energybattery storageenergyinfrastructure
Floor area
279 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of a c. 30 mw capacity battery storage facility within a secured compound and will – subject to detailed design, commercial and technical considerations, include the following elements: (a) a control building (c. 279 sq. M. , c. 4.7m high); (b) plant and equipment comprising: (1) up to 34 no. Battery container units (c. 30 sq. M. And up to c. 4.7m high) with roof mounted hvacs; (2) up to 17 no. Battery unit transformers on concrete plinths (c. 10.6 sq. M. And c. 4m high); (3) up to 17 no. Inverter units (c. 30 sq. M. And c. 3 m high); (4) a bunded transformer (c. 66 sq. M. And c. 6 m high) with firewall on one side; (5) a bunded house transformer (c. 20 sq. M. And c. 3 m high) surrounded on three sides by a 3m high firewall; (6) var support system on a concrete plinth (c. 24 sq. M. And c. 3.4 m high); (7) cable trays and associated service connections; (8) other ancillary electrical plant; (9) up to 5 no. Lightning masts (c. 20 m high); (10) a c. 18 m high scada pole; (11) pole mounted security cameras (c. 8.3 m high); (c) c. 2.6 m high palisade fencing and gates; and (d) ancillary site clearance and developments works including provision of areas of hardstanding, internal access roads, and connections to site services networks. Primary access will be via the existing access location from kylemore way road, to the north of the site. Secondary access, if required in exceptional circumstances, will be via an existing internal access to the east between the development site and the abutting esb owned 110 kv and 220 kv substation compound. Planning permission is being sought for a duration of 10 years.

Land-use zoning

What this land is zoned for

Z6: Employment/EnterpriseSI
To provide for the creation and protection of enterprise and facilitate opportunities for employment creation.

National zoning type: Industrial, enterprise, employment

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 28 June 2021. A completion certificate was lodged on 3 February 2022.

Notified floor area: 46

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
27 Millrose Est, Bluebell Ave, Bluebell Dublin 12Apr 2025€328,000319 m
1 Hollybrook, Bluebell Avenue, Bluebellnot full market priceApr 2025€320,000337 m
101 Jamestown Rd, Inchicore, Dublin 8Oct 2025€436,000422 m
66 La Touche Rd, Dublin 12, DublinJan 2025€500,000424 m
309 Landen Rd, Ballyfermot, Dublin 10Apr 2025€308,000441 m
56 La Touche Rd, Bluebell, Dublin 12Feb 2025€370,000452 m
91 Jamestown Rd, Inchicore, Dublin 8Apr 2025€415,000452 m
29 La Touche Drive, Bluebell, Dublin 12Jan 2025€290,000457 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received23 October 2019
  2. Decision due17 December 2019
  3. Decision issued13 December 2019
  4. Grant issued28 January 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.