GrantedEnergyDecided 24 January 2019

Lands to the north of South Bank Road, Ringsend, Dublin 4

Construction of a 30 MW capacity battery storage facility with a control building.

3373/18 · Dublin City Council · Lodged 26 June 2018

Reference
3373/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
26 June 2018

Summary

AI-generated

The development consists of a new 30 MW capacity battery storage facility within a secured compound. The site will feature up to 12 battery storage units, a single-storey control building, electrical plant, and a 15.6m high lightning mast.

Energybattery storagegrid infrastructureenergy
Storey
1
Floor area
279 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of a c. 30 mw capacity battery storage facility within a secured compound on a 1.06 ha site and will, subject to detailed design, commercial and technical considerations, include: (a) up to 12 no. Battery storage units [each typically comprising: a containerised battery (c. 12.2m x 2.5m x 3.2m), hvac (c. 2.7m x 2.7m), inverter (c. 3m x 3m) and transformer (c. 3.3m x 3.3m) ](b) a 279sq. M. Single-storey control building; (c) ancillary electrical plant including 2 no. Transformers, var support unit and cable sealing ends (d) a c. 15.6m high lightning mast; (e) a 2.6m high palisade boundary fence and new access gates at the two existing vehicular entrances from south bank road, and on the northern boundary where access will be via the existing dublin bay power station; (f) ancillary site works including the installation of site services.

Land-use zoning

What this land is zoned for

Z7: Employment (Heavy)SI
To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

National zoning type: General industry

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received26 June 2018
  2. Further information requested8 October 2018
  3. Further information received19 December 2018
  4. Decision due24 January 2019
  5. Decision issued24 January 2019
  6. Grant issued1 March 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.