Planning Permission Ireland
GrantedExtensionDecided 16 October 2023

Marian Nursing Home, Old Finglas Rd. Glasnevin, Dublin 11

Construction of a new canopy and a small sitting area extension at Marian Nursing Home.

4346/23 · Dublin City Council · Lodged 22 August 2023

Reference
4346/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
22 August 2023

Summary

AI-generated

Permission is sought for a new canopy over an existing external stairs and an 8.6 square metre extension to the sitting area north of the courtyard. The works are located within the curtilage of the protected Holy Faith Convent.

Extensionnursing homecanopyheritage
Floor area
9 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: planning permission is being sought for the construction of a new canopy over the existing external stairs to the east of the nursing home and the construction of an 8.6sqmt. Extension to the existing sitting area to the north of the existing courtyard and all associated site works at marian nursing home, old finglas rd. Glasnevin, dublin 11, for the holy faith sisters. This proposal is within the curtilage of a protected structure structure holy faith convent (house) ref rps 3231.

Land-use zoning

What this land is zoned for

Z12: Institutional Land (Future Development Potential)RS
To ensure existing environmental amenities are protected in the predominantly residential future use of these lands.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 1 June 2024. A completion certificate was lodged on 16 May 2025.

Notified floor area: 8.6

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
8 St Davids Terrace, Glasnevin, Dublin 9Sept 2025€900,000123 m
18 River Gardens, Glasnevin, Dublin 9Jun 2025€195,000132 m
33-101 Millfield View, Glasnevin Hill, Glasnevinprice excludes VATJun 2026€31,426,991146 m
5 River Gardens, Glasnevin Hill, Glasnevin Dublin 9Apr 2026€230,000154 m
9 River Gardens, Glasnevin Hill, GlasnevinJul 2025€363,500154 m
10 River Gardens, Glasnevin, DublinMay 2025€293,500154 m
9 River Gardens, Greenshillprice excludes VATJan 2026€378,370156 m
19 Glasnevin Hill, Glasnevin, Dublin 9May 2025€580,000168 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 August 2023
  2. Decision due16 October 2023
  3. Decision issued16 October 2023
  4. Permission expiry10 January 2029

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.