GrantedIndustrialDecided 22 January 2020

at a site located within the south-west corner of the St. James's Gate brewery lands bound by James Street to the south, Watling Street to the east, Steven's Lane to the west and Victoria Quay to the north, Dublin 8

Construction of a new forklift building at the Diageo St. James's Gate brewery.

4530/19 · Dublin City Council · Lodged 25 November 2019

Reference
4530/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
25 November 2019

Summary

AI-generated

The proposed development consists of a new 236 square metre forklift building within the existing brewery production facility. The building will include a work area, office, breakroom, storage area, and a metal canopy.

Industrialbreweryindustrialforklift
Floor area
236 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Planning permission for development within the existing diageo brewery production facility at st. James's gate, at a site located within the south-west corner of the st. James's gate brewery lands bound by james street to the south, watling street to the east, steeven's lane to the west and victoria quay to the north, dublin
  • The proposed development will consist of: (1) the construction of a forklift building (gfa 236sq. M) (c. 14.8m in height), with a return to the north and a metal canopy projecting from a section of the west elevation (+13.647m). The building will comprise of: a work area and gantry; office; breakroom; and storage area. The building will be accessible via: a double height roller shutter door on the west elevation; a single height roller shutter door on the north elevation; and standard pedestrian doors on the west, east and south elevations. Windows will be positioned on the north and west facades. An access ramp will also be installed on the north elevation. A fire escape cage ladder will be located on the southwest corner of the building. The building will have an aluminium clad facade, metal flashing at parapet level and roof lights. A pedestrian barrier will also be erected to the immediate west of the building for safety purposes. (2) the construction of a new canopy structure (gfa 1,070sq. M) (c. 8.9m in height) made up of steel columns and trusses and a metal panel deck roof. The canopy will be open on each elevation. The fire escape ladder proposed as part of the forklift building will also connect to the canopy structure at roof level on the north elevation. (3) the construction of an oil containment building (gfa 21.8sq. M) (c. 2.9m in height) with a blockwork facade and metal flashing at parapet level. The structure will have a flat roof and will be erected on a concrete plate. The structure will have four sets of welded wire mesh gates on the north elevation. (4) the construction of a hot works unit (gfa 28.7sq. M) (c. 4.3m in height) with a metal clad facade and a metal pitched roof. The structure will be erected on a concrete plate. The hot works unit will be accessible via a roller shutter door on the north elevation and a standard pedestrian door on the west elevation. (5) all associated site development works on a site of c. 0.24ha. The proposed development is located within a site which has an approved ie (industrial emissions) licence (ref. No. P0301-04)

Land-use zoning

What this land is zoned for

Z7: Employment (Heavy)SI
To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

National zoning type: General industry

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 17 November 2021. A completion certificate was lodged on 26 May 2022.

Notified floor area: 227.5

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
49 Steevens Gate, James St, Dublin 8Apr 2025€435,00051 m
Apt 38 Steevens Gate, 126 - 133 James Street, Dublin 8Feb 2025€545,00075 m
Apt 9, St James'S Court, Echnlin StreetMar 2026€280,000166 m
205 Phoenix View, Jamess St, Dublin 8Jul 2025€265,000197 m
Apt 402, Phoenix View, Jamess St Dublin 8Jun 2026€382,000197 m
29 Bowlane West, Kilmainham, Dublin 8Nov 2025€800,000219 m
1 St James Ave, Jamess St, Dublin 8not full market priceJun 2026€150,000247 m
22 Chandlers Guild, Jamess St, Dublin 8Jun 2025€305,000312 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 November 2019
  2. Decision due28 January 2020
  3. Decision issued22 January 2020
  4. Grant issued3 March 2020

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.