InvalidCommercialDecided 11 August 2022

14-15, Trinity Street and 1-4A Dame Lane and fronting onto Saint Andrew's Lane, Dublin 2, D02 C58

Amendments to a permitted commercial development on Trinity Street, including basement and floor layout changes.

4607/22 · Dublin City Council · Lodged 3 August 2022

Reference
4607/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
3 August 2022

Summary

AI-generated

The proposed development consists of amendments to a previously permitted scheme. Changes include a reduced basement area, a reconfigured ground floor with a double ESB substation, a reduced restaurant area, a new cafe/reception area, and increased office space on the upper floors.

Commercialcommercialofficerestaurantamendments
Storeys
8

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development will consist of amendments to the previously permitted development granted under dublin city council reg. Ref. 2421/20 and an bord pleanála reg. Ref. Abp-309400-21. The proposed amendments include reconfiguration of the permitted development as follows: (i) basement level: reconfiguration of the shape and structure of the basement level from that permitted, resulting in a reduction of the proposed area by c. 48.65 sqm to an overall c. 326.58 sqm. (ii) ground floor level: reconfiguration of the permitted esb substation/switchroom (c. 14 sqm) to a double substation (c. 27.74 sqm) resulting in a relocation of the associated doorways to the north elevation onto dame lane; relocation of the main entrance doorway; reduction in the area for the permitted restaurant from c. 447.8 sqm to c. 375.92 sqm; change of use of part of the permitted office area to café/reception area c. 74.14 sqm. (iii) first to eight floor levels: reconfiguration of the internal core area to accommodate a unisex wc arrangement; an increase of the office areas on these floors by a total of c. 174.4 sqm; minor changes to the external façade to facilitate. (iv) roof level: reconfiguration of the proposed roof level plant area to align with passivhaus compliance, including the provision of 2 no. High efficiency air handling units, resulting in a minor increase in height to c. 36.279m above ground (44.129m odm, including lift overrun). (v) all associated site development works.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apartment 5, 50-52 Dame Street, Dublin 2Nov 2025€395,000111 m
3 Fownes St, Temple Bar, Dublin 2May 2026€1,600,000112 m
Apt 1, 3 4 Cope St, Dublin 2Oct 2025€2,250,000130 m
Top Floor Apt., 5a Fownes Street Upper, Temple BarOct 2025€250,000133 m
Apt 24 Sprangers Yard, Crowe St, DublinSept 2025€340,000134 m
Apartment 4, 5-6 Temple Lane South, Temple BarNov 2025€355,000166 m
Apartment 5, 5-6 Temple Lane South, Temple BarNov 2025€355,000166 m
The Friary, Cecilia St, Temple Bar Dublin 2Dec 2025€266,666169 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received3 August 2022
  2. Decision due27 September 2022
  3. Decision issued11 August 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.