Planning Permission Ireland
RefusedCommercialDecided 28 September 2022

Heuston South Quarter which is bounded by St. John's Road West (to the north), Military Road (to the east) and the Royal Hospital Kilmainham (Protected Structure) (to the west and south), Kilmainham, Dublin 8

Construction of a 238-bedroom hotel and an office block at Heuston South Quarter.

4610/22 · Dublin City Council · Lodged 4 August 2022

Reference
4610/22
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
4 August 2022

Summary

AI-generated

The proposed mixed-use commercial development will deliver a cumulative gross floor area of 32,602 square meters. It features a 5-storey hotel over lower ground and basement levels, an office block, and integrated basement parking.

Commercialhotelofficecommercialdemolition
Storeys
5
Floor area
32,602 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The proposed development will provide a mixed use commercial development comprising of a hotel (238 no. Bedrooms) and an office block delivering a cumulative gross floor area (gfa) of 32,602 sq. M, inclusive of basement area. The proposed development consists of: -site clearance and localised demolitions to remove part of the podium and basement level-1 reinforced concrete slabs at the interface of the proposed hotel and office blocks, together with the incorporation of part of the existing basement level structure extending to approximately 4,228 sq. M (gfa). -the proposed basement will be integrated within the existing basement levels serving the wider hsq development and will be accessed from the existing vehicular ramped accesses/egresses onto/off st. John's road west and military road to the north and east, respectively. The proposed basement area is split into two areas to provide a dedicated hotel basement area of approximately 2,132 sq. M (gfa) and an office basement area of 2,096 sq. M (gfa) -the construction of a 5-storey hotel (over lower ground and basement levels) to provide 238 no. Bedrooms. At basement level provision is made for 24 no. Car parking spaces; 2 no. Motorcycle spaces together with plant and storage rooms. A waste storage area with dedicated loading bay/ staging area is provided along with dedicated set-down area for deliveries. A dual-purpose service bay is also provided at basement level with modifications to existing line markings to the basement parking area to accommodate the development. At lower ground floor level provision is made for 14 no. Bedrooms; conference room; kitchen and staff facilities and changing rooms/ wcs plus ancillary gym. This floor is arranged around an internal courtyard space. Provision is made at podium level for 19 no. Bedrooms; dining area and foyer with entrance at the south-eastern corner of the building onto a new laneway separating the proposed hotel and office building. Provision is made at the south-western corner at podium level for an esb sub-station/switch room and 15 no sheffield type bicycle stands are provided for the hotel and the retail/cafe unit, providing storage space for 30 no. Bicycles. A total of 205 no. Bedrooms are provided at the upper levels (above podium level). The top floor of the hotel (4th floor) has a splayed setback to provide a west facing roof terrace. An ancillary hotel bar (118 sq. M) opens onto this roof terrace. -the construction of a 12-storey (over lower ground and basement levels) office building to the east of the proposed hotel building to provide 19,474 sq. M of office floorspace (gfa) from lower ground floor level and above. Provision is made at basement level for 30 no. Car parking spaces; 2 motorcycle spaces and 120 no. Bicycle storage spaces together with plant and storage rooms. Provision is made for a further 196 no. Bicycle storage spaces at lower ground floor level plus changing rooms (including showers). At podium level 2 no. Esb sub-stations and switch rooms are proposed. The foyer and entrance is provided at the southern end of the building at podium level along with a retail/cafe unit of 208 sq. M at the south-western corner of the building. The building is setback at 4th floor level to provide a west facing roof terrace. Splayed setbacks to the southern and eastern elevations at the 11th floor level forms a roof terrace that wraps around the south-eastern corner of the building. Plant is provided at rooftop level that is enclosed by curved louvred screens and pv panels. -works proposed along the st john's road west frontage include the omission of the existing left-turn filter lane to the vehicular ramped access to the hsq development and re-configuration of the pedestrian crossing at the existing junction together with the re-configuartion of the existing pedestrian crossing over the westbound lanes of st. John's road west leading to an existing pedestrian refuge island and re-alignment of the existing foothpath along the site frontage onto st. John's road west to tie into the reconfigured junction arrangement. -drainage works proposed include the provision of 2 no. Below basement surface water attenuation tanks with dusty/stand-by arrangement pump sumps and associated valve chambers, and 2 no. Below basement foul pump sumps with duty/stand-by arrangement and 24hr emergency storage and associated valve chambers. New foul drainage and stormwater drainage connections are proposed to existing foul and storm sewers in st. John's road west with associated site works. -hard and soft landscaping works are proposed at lower ground level along st john's road west and at podium level to provide for the extension and completion of the public plaza to the south of the proposed office block and the provision of a new pedestrian laneway connecting st john's road west with the public plaza at podium level. The application is accompanied by an environmental impact assessment report (eiar) and natura impact statement (nis).

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
96 Dargan Building, Heuston South Quarter, St Johns Road WestMar 2026€475,000118 m
287 Kerstrel Building, Heuston South Quarter, St Johns Road WestMay 2026€531,000120 m
292 Kestrel Building Blocks 9a 9c, Heuston South Quarter, St Johns Rd West Dublin 8Mar 2026€535,000120 m
18 Telford Building, Heuston South Quarter, St Johns Rd West Dublin 8Jan 2026€376,000142 m
29 Telford Building, Heuston South Quarter, St Johns Road WestJul 2026€580,000142 m
140 Dargan Buildings, Dublin 2Mar 2025€320,000146 m
154 Dargan Building, Heuston South Quarter, St Johns WestSept 2025€521,000146 m
166 Apt, Dargan Building Block 7b, Heuston South Quarter Dublin 8Mar 2026€575,000146 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received4 August 2022
  2. Decision due28 September 2022
  3. Decision issued28 September 2022
  4. Grant issued31 January 2024
  5. Appeal submitted27 October 2022
  6. Appeal decided31 January 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.