Planning Permission Ireland
GrantedCommercialDecided 28 February 2025

The Ripley Court Hotel, 37 Talbot Street, Dublin 1

Internal modifications to the Ripley Court Hotel to create 21 new en suite bedrooms and a new cafe/workhub.

WEB2457/24 · Dublin City Council · Lodged 8 November 2024

Reference
WEB2457/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
8 November 2024

Summary

AI-generated

The development consists of internal modifications to the existing hotel layout. This includes converting basement parking spaces and ground floor conference/bar areas into 21 en suite hotel bedrooms, creating an open-air courtyard, and changing the use of a deli/restaurant to a cafe/workhub.

Commercialhotelrenovationcafe

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

(a) internal modifications to the existing layout hotel building comprising: (i) at basement level, removal of 7 no. Parking spaces to provide for 4 no. En suite hotel bedrooms, store room and a protected corridor with escape stairs. Provision of new windows to proposed bedrooms on the eastern elevation. A new fire door will be provided to access existing escape stairs. Alterations to existing cold store, switch room and wcs to provide for kitchen store, changing rooms and staff canteen. Relocation of water tank, removal 2 no. Parking spaces and creation of new ope to provide 4 no. Parking spaces. Merging of 2 no parking spaces to provide 1 no. Accessible parking space; (ii) at ground floor, alterations to conference rooms and bar, foyer, and hotel bar to provide for 17 no. En suite hotel bedrooms, guest laundry room, 2 no. Offices and wcs. Provision of new windows to the proposed bedrooms on the eastern elevation. Removal of roof light and roof over bar to provide for an open-air courtyard. Modifications to the layout of the kitchen and guest dining room. Provision of a modified lounge, foyer and reception area. (iii) change of use of deli/restaurant to cafe/workhub with alterations to provide for a café and work hub with a conference room, 2 no. Offices, staff kitchen and an accessible wc to the rear; (iv) provision of roof light to serve ground floor meeting room; (b) external works comprising: (v) provision of new shop front and signage to hotel entrance and café/workhub; (vi) reinstatement of existing blocked-up windows fronting foley street; (vii) removal of roof covering to the external yard to the eastern side. (viii) the development also includes all other associated engineering works, landscaping, and ancillary works necessary to facilitate the development. No works proposed for 1st to 3rd floors. The proposal will result in a total of 137 no. Hotel bedrooms.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 13 August 2018. A completion certificate was lodged on 28 March 2024.

Notified floor area: 4,616

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
12 Liberty Corner, Foley St, Dublin 2Aug 2025€381,00062 m
Apt 1 3, 3a, Talbot Stnot full market priceApr 2025€265,00080 m
Flat 1, 46 Talbot Street, Dublin 1Mar 2025€535,00083 m
18 Liberty Corner, Foley St, Dublin 1Jun 2025€350,00090 m
17 Liberty Corner, Foley St, Dublin 1Jun 2025€350,00090 m
24 The Millhouse Block C, The Steelworks, Foley St Dublin 1Nov 2025€387,00090 m
Apt 28, The Atrium, Foley St Dublin 1Feb 2025€268,00092 m
Apt 10, The Atrium, Foley St Dublin 1Apr 2025€279,00092 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received8 November 2024
  2. Decision due4 March 2025
  3. Decision issued28 February 2025
  4. Permission expiry19 May 2030

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.