Planning Permission Ireland
RefusedAlterationsDecided 19 February 2019

6, 7, 8 and 9, College Street & 28, 29-30 & 31 Fleet Street, Dublin 2

Demolition, extension, and change of use works across several protected structures on College Street and Fleet Street.

4650/18 · Dublin City Council · Lodged 18 December 2018

Reference
4650/18
Authority
Dublin City Council
Register status
Appealed
Type
Permission
Received
18 December 2018

Summary

AI-generated

The proposed development involves several protected structures including the Irish Yeast Co. and Doyles public house. Works include the demolition of a rear return, extension of hostel and public house uses, and internal modifications.

Alterationsprotected structurehostelpubdemolition
Storeys
4

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: permission for development on this site (0.0634ha) within the existing interlinked 4-storey over basement properties at 6, 7, 8 and 9 college street, 28, 29-30 and 31 fleet street, dublin 2 (premises comprising the irish yeast co. , barbers room and times hostel buildings on college street, bowes public house and adjoining vacant unit on fleet street and doyles public house on the corner of college street and fleet street). 6, 7 and 8 college street and 28, 29-30 and 31 fleet street are all protected structures. The proposed development comprises demolition of existing two-storey return to the rear of 6 college street and 29-30 fleet street and change of use and extension of the ground, first, second and third floors of 6 college street and modifications to of part of the permitted licensed cafe/bar (reg. Ref. 3397/15) at ground floor and basement levels of 29-30 fleet street to provide for an extension of the public house use at ground floor and basement levels at 31 fleet street and an extension of the first, second and third floor levels of the hostel use accessed from 8 college street (times hostel). The development will consist of the following: basement level: - reconfiguration and alternatives to existing internal doors, walls and stairs and provision of partitions to facilitate installation of toilet facilities and associated stairs access within 29-30 fleet street to serve the adjoining bowes public house at 31 fleet street. The residual basement area of 29-30 fleet street will remain within the demise of doyle's public house. Ground floor level: - reconfiguration and alterations to existing doors, walls and partitions to provide for an extension of existing public house at 31 fleet street into the adjoining 6 college street and 29-30 fleet street to accommodate additional bar and accessible toilet areas and provision of stairs access to the basement level of 29-30 fleet street. First, second and third floor levels: - reconfiguration and alterations to existing doors, walls and partitions within 6 college street and 31 fleet street and extension into the existing internal courtyard area and to the rear of 31 fleet street to provide 9 no. Hostel dormitories (3 per floor) accessed from the existing first, second and third floor hostel accommodation within 31 fleet street. The proposed development will result in an increase in the gross floor area of the bowes public house from 142sq. M to 336sq. M, an increase in the gross floor area of the times hostel premises from 1016sq. M to 1214sqm, a decrease in the gross floor area of the permitted cafe/bar at ground floor level within 29-30 fleet street from 78sq. M to 68sq. M and a decrease in the gross floor area of doyle's public house from 812sq,n to 743sq. M. Permission is also sought for cleaning and refurbishment of the existing building facade, shopfront and signage to 6 college street and all associated site and development works.

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt 3 Lafayette Building, 1 5 Dolier St, DublinOct 2025€400,00097 m
Apt 13, Corn Exchange, Poolbeg St Dublin 2May 2026€340,000147 m
32 Corn Exchange, Poolbeg St, Dublin 2Sept 2025€395,000147 m
29 Corn Exchange, Poolbeg St, Dublin 2Jun 2025€290,000147 m
43 Corn Exchange, Poolbeg St, Dublin 2Mar 2025€411,000147 m
63 Corn Exchange, Poolbeg St, Dublin 2Sept 2025€701,000147 m
34 Corn Exchange, Poolbeg St, Dublin 2Sept 2025€422,500147 m
14 College Close, Tara St, Dublin 2Nov 2025€320,000156 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received18 December 2018
  2. Decision due20 February 2019
  3. Decision issued19 February 2019
  4. Appeal submitted20 March 2019
  5. Appeal decided8 July 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.