Planning Permission Ireland
GrantedAlterationsDecided 29 May 2019

79, Dorset Street Upper, Dublin 1

Reinstatement of full residential use and extensive refurbishment of a four-storey over basement Protected Structure.

4692/18 · Dublin City Council · Lodged 20 December 2018

Reference
4692/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
20 December 2018

Summary

AI-generated

The development consists of returning a partially vacant four-storey over basement Protected Structure to full residential use. Works include internal layout alterations, window replacements, a new basement kitchen, a new back porch, and general structural and mechanical upgrades.

Alterationsprotected structurerefurbishmentrestoration
Storeys
5
Floor area
348 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: the development will consist of a reinstatement of full residential use to all levels of an existing four storey over basement (protected structure) building (area 348m2) formally hickey auctioneers and also partially vacant, including alterations to the existing layout. The proposed alterations to existing layout include (a) ensuites to all bedrooms and toilets off all reception rooms, (b) reinstatement of basements stairs and other sanitary provisions (c) replacement of all existing windows with new up & down painted timber sash windows, (d) new kitchen, utility, store, bin store and services in existing basement, (e) new back porch door & patio doors off livingroom to courtyard, (f) drop floor in basement return to provide for headspace, (g) general upgrade of all floors and walls for fire, sound and thermal performance where possible, (h) complete replacement and upgrade of all mechanical, electrical and heating installations, (i) repair and upgrade to existing front door and stone surround, (j) reinstatement of previously removed railings to street to match existing, (k) new bay window to ground floor reception room, (l) removal of previously inserted subdividing internal walls where required, (m) blocking up, adjusting, moving, replacing existing doors and reusing where possible and matching existing doors and surrounds. Also included are general improvements to the external appearance of the building and roof to prevent further water ingress and damage, general site landscaping including a rear courtyard patio.

Land-use zoning

What this land is zoned for

Z4: Key Urban Villages/Urban VillagesDC
To provide for and improve mixed-services facilities.

National zoning type: District, neighbourhood centre

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 9 August 2019.

Notified floor area: 348

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
80 Upper Dorset St, Dublin 1Mar 2025€725,0008 m
1 Adair Terrace, St Josephs Parade, Phibsborough Dublin 7Feb 2025€330,00043 m
4 St Josephs Parade, Dublin 7, DublinNov 2025€345,00052 m
23 St Joseph's Place, Off Dorset St, Dublin 7Jul 2025€380,00092 m
7 Blessington Court, Dublin 7Oct 2025€500,000101 m
31 St Josephs Place, Dublin 7, DublinJun 2026€390,000115 m
Apt 9, Sackville Court, Blessington St Dublin 7Jan 2025€235,000140 m
20 Sackville Court, Blessington Street, Dublin 1Apr 2025€225,000140 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 December 2018
  2. Further information requested22 February 2019
  3. Further information received2 May 2019
  4. Decision due29 May 2019
  5. Decision issued29 May 2019
  6. Grant issued5 July 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.