Planning Permission Ireland
GrantedApartmentsDecided 9 May 2022

120, Pembroke Road, Ballsbridge, Dublin 4, DO4 E7T1

Conversion of offices to apartments and creation of a triplex in a protected building.

3522/22 · Dublin City Council · Lodged 15 March 2022

Reference
3522/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
15 March 2022

Summary

AI-generated

The project involves changing the use of office spaces to residential units within a protected structure. It will create two 1-bedroom apartments, a 3-bedroom duplex, and a 1-bedroom triplex apartment, alongside internal refurbishments and fire safety upgrades.

Apartmentsconversionprotected structureapartments

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: the development will consist of change of use from office to residential use at level one (entrance level) and level 2 comprising 1- bedroom apartment on level 1 and 1-bedroom apartment on level
  • Removal of modern lobby to entrance hall at entrance level 1 and conversion of office toilets to shared laundry facility; amalgamation of 1 -bedroom apartments on level 3 and level 4 to 1 no. Duplex, 3-bedroom apartment including the reintroduction of return stairs between levels. Alterations to rear return to include change of use from office use to residential use, removal of sub-standard modern era sunroom and creation of a triplex 1-bedroom apartment with two new floors at levels 2.5 and 3.5 and minor extension and alteration to north gable, including replacement of existing modern sub-standard external metal stairs with new metal stairs. All the above to include related alterations to layout and refurbishment of the interior structure, fire upgrade including provision of fire rated screen at level 1.5, new smoke vents at existing arched landing window and at roof level, refurbishment of existing roof lights at level 4, new service riser and general mechanical and electrical services installation including new boiler flues to rear elevations, and all ancillary works to include services to facilitate the development

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
108 Baggot Lane, Dublin 4Jan 2026€820,00061 m
Apt 15, Pembroke Court, 75-77 Pembroke RoadJul 2025€345,00088 m
Apt 23, Pembroke Court, Pembroke Rd Dublin 4Sept 2025€550,00088 m
Apt.1 Finsbury House, 79 - 81 Pembroke Rd, Ballsbridgenot full market priceJan 2026€2,100,000116 m
Apt 16, 59 Pembroke Rd, Ballsbridge Dublin 4Mar 2026€415,000146 m
Apt 10, 57 Pembroke Rd, Ballsbridge Dublin 4Sept 2025€350,000157 m
Apt 3, 57 Pembroke Rd, Dublin 4Sept 2025€350,000157 m
8 Baruva House, 57 Pembroke Rd, Dublin 4Sept 2025€405,000157 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 March 2022
  2. Decision due9 May 2022
  3. Decision issued9 May 2022
  4. Grant issued21 June 2022

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.