Planning Permission Ireland
InvalidExtensionDecided 7 October 2022

Bayview Cottage, 45B Pigeon House Road, Ringsend, Dublin 4, D04 P6K1

Demolition of outbuildings and construction of two single-storey extensions to a cottage in Ringsend.

4960/22 · Dublin City Council · Lodged 30 September 2022

Reference
4960/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
30 September 2022

Summary

AI-generated

The project involves the demolition of an existing shed, porch, roof, and single-storey extensions at Bayview Cottage. It will be replaced with two new single-storey extensions, roof lights, wall modifications, and associated site works.

Extensiondemolitionextensioncottage
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Planning permission for development at a site of c. 0.077 hectares. The application site is accessed via a shared private lane via pigeon house road. The development will consist of: a) demolition of existing shed, single storey extension to south elevation, single storey extension to west elevation, porch to north elevation and the existing cottage roof. B) 2 no. Proposed single storey extensions, one to south elevation and a second to the south-west elevation of the existing dwelling, with all associated roof lights. C) modifications of all existing external and internal walls. D) all associated boundary treatments, landscaping, and site works with provision for 1 no. Parking space.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 29 July 2025.

Notified floor area: 131.6

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
48 Ringsend Park, Ringsend, Dublin 4Jun 2025€450,00066 m
51 Ringsend Park, Ringsend, Dublin 4May 2025€445,00078 m
14 Cambridge Ave, Ringsend, Dublin 4Jan 2026€461,00085 m
53 Ringsend Park, Ringsend, DublinMay 2025€310,00086 m
8 Cambridge Ave, Ringsend, Dublin 4Jun 2026€656,00087 m
19 Cambridge Ave, Ringsend, Dublin 4Feb 2026€606,000102 m
75 Ringsend Park, Ringsend, Dublin 4Jan 2025€380,000189 m
32 Poolbeg Quay, Pigeon House Road, RingsendSept 2025€435,000193 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received30 September 2022
  2. Decision due24 November 2022
  3. Decision issued7 October 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.