GrantedCommercialDecided 10 May 2023

Site of the former Clerys' warehouse building at Nos 13, 14 and 15 Earl Place, Dublin 1

Construction of a 9-storey hotel with 229 bedrooms, a restaurant, and a public bar on the site of the former Clerys warehouse.

5479/22 · Dublin City Council · Lodged 20 December 2022

Reference
5479/22
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
20 December 2022

Summary

AI-generated

The proposed development consists of constructing a 9-storey hotel (over basement) with setbacks on a 0.129-hectare site. The hotel will feature 229 bedrooms, an associated licensed restaurant, and a public bar, utilizing the existing pile layout from previous enabling works.

Commercialhotelredevelopmentcity centre
Residential units
229
Storeys
9

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development on this site of c. 0.129 hectares at lands known as the site of the former clerys warehouse building at nos. 13, 14 and 15 earl place, dublin
  • Planning permission was received for development, including development on this site, under dublin city council reg. Ref. 3442/16 (as extended under reg. Ref. 3442/16/x1 to 28th july 2025) (and subsequently amended by reg. Refs. 3933/19 and 3576/21 (decisions are pending on reg. Refs. 4995/22 and 5171/22 (which were lodged with the planning authority on 5th october 2022 and 4th november 2022, respectively)). Demolition of clerys' warehouse building, reduction of ground level and enabling works (comprising contiguous piled wall with an insitu reinforced concrete capping beam, along with internal piles and temporary steel propping of perimeter walls) have been undertaken on the site further to this permission. The existing pile layout will be used for the proposed development. The proposed development will consist of the construction of a building 9 storeys (with setbacks) in height (over basement) comprising hotel and associated licenced restaurant and public bar uses. The hotel will comprise 229 no. Bedrooms and related ancillary hotel facilities including reception area, lobby, licenced restaurant with lounge and public bar, cold room, kitchen, toilets, storage areas, administration and staff facilities, plant room, refuse area and bicycle parking area) with a total new build gross floor of c. 8,602 sq m (including c. 319 sq m basement, and esb substation and switch room). The development will also include: the removal of the remaining elements of the former warehouse building and other associated development; associated lighting; pedestrian access/egress via earl place; sustainable urban drainage systems (including green roofs and attenuation tanks); roof-mounted photovoltaic panels, roof plant and associated screening; associated hard and soft landscaping; and all other associated site excavation, infrastructural and site development works above and below ground including changes in level, boundary treatments and associated site servicing (foul and surface water drainage and water supply)

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 3 March 2025.

Notified floor area: 8,721

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
17 Kennan Avenue, Luttrellstown Gate, Dublin 15price excludes VATAug 2025€480,176115 m
7 Kennan Avenue, Luttrellstown Gate, Dublin 15price excludes VATAug 2025€590,308115 m
13 Kennan Avenue, Luttrellstown Gate, Dublin 15price excludes VATAug 2025€528,634115 m
33 Kennan Avenue, Luttrellstown Gate, Dublin 15price excludes VATAug 2025€471,366115 m
Apt 110 Longboat Quay North, Hannover Dock, Dublin 2Jul 2025€675,000115 m
Apt 77 The Gardens At Elmpark Green, Merrion Road, Dublin 4price excludes VATMay 2025€1,299,550115 m
5 Kennan Avenue, Lutrellstown Gate, Dublin 15price excludes VATAug 2025€590,308115 m
29 Kennan Avenue, Luttrellstown Gate, Dublin 15price excludes VATAug 2025€519,824115 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 December 2022
  2. Decision due10 May 2023
  3. Decision issued10 May 2023
  4. Permission expiry3 August 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.