Planning Permission Ireland
GrantedAlterationsDecided 15 June 2018

Sir John Rogerson's Quay, Britain Quay, Green Street East and Benson Street, Dublin 2

Changes to the basement levels and surface layout of the Capital Dock development.

DSDZ2145/18 · Dublin City Council · Lodged 25 January 2018

Reference
DSDZ2145/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
25 January 2018

Summary

AI-generated

The proposed development comprises modifications to the two permitted basement levels and surface level layout at the Capital Dock site. The changes include reducing the number of car parking spaces to 339 and providing 674 bicycle parking spaces.

Alterationsbasementparkingcommercialdocklands

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Kw real estate icav acting for and on behalf of kw irish real estate fund viii intends to apply for permission for development at a site of c. 1.93 ha, known as capital dock, at sir john rogerson's quay, britain quay, green street east and benson street, dublin
  • The site adjoins the state street bank building to the west. The proposed development comprises changes to the two basement levels and changes at surface level, previously permitted under dsdz2546/15 (the parent permission) as amended by permission references dsdz4345/15, dsdz2663/16, dsdz4102/16, dsdz3796/16, dsdz3572/17 and dsdz4135/17. The basement levels are now described as follows: a two level basement (c. 23,781 sq. M gross floor area as previously permitted), accessed via existing entrance on green street east (shared with state street bank building), to serve the mixed-use development permitted under dsdz2546/15 (as amended by subsequent related permissions), to accommodate: a total of 339 no. Car parking spaces (a decrease of 33 no. Spaces from the permitted), of which 94 no. Car parking spaces to serve the permitted commercial (office) floor area (c. 40,075 sq. M gfa), a total of 674 no. Bicycle parking spaces (an increase of 24 no. Spaces from the permitted), and the reconfiguration of other associated and ancillary facilities including: plant, utility and attenuation areas, refuse storage, employee welfare facilities, remote residential storage, remote non-residential storage, stair and lift cores, and circulation areas. Proposed reconfiguration of site development and landscape works at surface level to include: re-positioning of permitted car-parking/set down spaces at the entrance to block a & b (no change in number of spaces); 1 no. New set down space adjoining block g. The removal of 2 no. Ventilation funnels and relocation of 1 no. Ventilation funnel along the roadway between block b and blocks f & e. The removal and relocation of 1 no. Permitted set down space from green street east to the space between block d and the existing state street bank. All associated with and ancillary to the development otherwise permitted under parent permission dsdz2546/15 (as amended). This application relates to proposed development within the north lotts & grand canal dock strategic development zone planning scheme area

Land-use zoning

What this land is zoned for

Z14: Strategic Development and Regeneration Areas (SDRAs)RS
To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

National zoning type: Residential, mixed residential and other uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apartment 24, Hanover Court, Hanover QuayJul 2025€780,00076 m
Apt 26, Hanover Court, Hanover QuayDec 2025€790,00076 m
20 Hanover Court, Hanover Quay, DublinFeb 2026€745,00076 m
Apt 7 Block D, Butlers Court, 77 Sir John Rogersons Quaynot full market priceNov 2025€380,000137 m
Apt 26 Block D, Butlers Court, 77 Sir John Rogerson's QuayOct 2025€610,000137 m
15 Portview, Thorncastle St, RingsendSept 2025€460,000169 m
39 Portview, Thorncastle St, Ringsend Dublin 4Sept 2025€1,020,000169 m
1 Portview, Thorncastle St, RingsendSept 2025€11,440,000169 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received25 January 2018
  2. Further information requested21 March 2018
  3. Further information received21 May 2018
  4. Decision due15 June 2018
  5. Decision issued15 June 2018
  6. Grant issued15 June 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.