Site generally bounded by North Wall Quay, Castleforbes Road, New Wapping Street and Mayor Street Upper, Dublin 1
Internal and basement modifications to an under-construction commercial block in Dublin 1.
DSDZ3103/22 · Dublin City Council · Lodged 20 January 2022
- Reference
- DSDZ3103/22
- Authority
- Dublin City Council
- Register status
- Decided
- Type
- Permission
- Received
- 20 January 2022
Summary
AI-generatedThe application proposes amendments to an ongoing development within the North Lotts and Grand Canal Dock SDZ. Modifications include revised basement layouts, extended shower and changing facilities, and relocated plant and utility rooms.
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Planning permission for development at this site generally bounded by north wall quay, castleforbes road, new wapping street and mayor street upper, dublin
- This application relates to a proposed development within the north lotts and grand canal dock sdz planning scheme area. The development will consist of amendments to block a (a1, a2 and basement) permitted under reg. Ref. Dsdz2750/16 and dsdz3350/15, as amended by reg. Ref. Dsdz3130/17, reg. Ref. Dsdz4558/18, reg. Ref. Dsdz4465/18 and dsdz2116/20. This building is under construction. The development will consist of modifications to the internal layout to include: revised layout and extension of shower and changing facilities, additional welfare room to provide drying facilities, change in location and size of plant, provision of additional accessible wc and omission of catering store room all at level
- 2 (basement) in blocks a1 and a2; relocation of fire doors at level
- 1 (basement) and level 0 (ground floor) in blocks a1 and a2, medium voltage and low voltage(lv)/switch rooms relocated and resized in block a1, additional plant room added in blocks a1 and a2 adjacent to substations, lv switch room added in block a2, goods lift relocated in block a1, modifications to receptions layout in blocks a1 and a2 including relocation of security turnstiles and provision of accessible wcs all at level 0 (ground floor); and; the provision of additional accessible wc provided on levels 1 to 6 in block a1. The development will also consist of the relocation of 17 no permitted bicycle spaces and a reduction in car parking spaces from 21 to 13 no. Spaces at level-2 (basement) serving block a; and; all associated site works. The proposed amendments will not result in any changes to the footprint or external elevations of block a as permitted
Land-use zoning
What this land is zoned for
“To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.”
National zoning type: Residential, mixed residential and other uses
Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 3 Upper Mayor St, North Wall, Dublin 1 | May 2025 | €680,000 | 89 m |
| 64 Co-living Units, Block 2 Spencer Place (north), Mayor Street Spencer Dock | Aug 2025 | €24,420,751 | 170 m |
| 94 Residential Units, Block 2 Spencer Place (north), Mayor Street Spencer Dock | Aug 2025 | €40,915,762 | 170 m |
| 202 Residential Units, Block 1 Spencer Place (north), Mayor Street Spencer Dock | Aug 2025 | €88,452,722 | 194 m |
| 299e Castleforbes Square, North Wall, Dublin 1 | May 2026 | €375,000 | 229 m |
| Apt 300, Castleforbes Sq, Dublin 1 | Jun 2026 | €555,000 | 229 m |
| 291 Block E, Castleforbes Sq, Dublin 1 | Jun 2026 | €477,000 | 248 m |
| Apt 277, Castleforbes Sq, Castleforbes Rd Dublin 1 | Feb 2025 | €476,000 | 248 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received20 January 2022
- Decision due16 March 2022
- Decision issued27 January 2022
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- GrantedAt this site
Planning permission for development at this site generally bounded by North Wall Quay, Castleforbes Road, New…
Site generally bounded by North Wall Quay, Castleforbes Road, New Wapping Street and Mayor Street Upper, Dublin 1
DSDZ3199/22Dublin CityLodged 2 Feb 2022Alterations
- GrantedAt this site
This application relates to a proposed development within the North Lotts and Grand Canal Dock SDZ Planning…
generally bounded by North Wall Quay, Castleforbes Road, New Wapping Street and Mayor Street Upper, Dublin 1
DSDZ2116/20Dublin CityLodged 24 Jan 2020Alterations
- Granted30 m away
This application relates to a proposed development within the North Lotts and Grand Canal Dock SDZ Planning…
Site Bound By North Wall Quay, Castleforbes Road, New Wapping Street and Mayor Street Upper, Dublin 1
DSDZ4558/18Dublin CityLodged 7 Dec 2018Commercial
- Granted50 m away
For development at a site generally bounded by North Wall Quay, Castleforbes Road, New Wapping Street and…
Site generally bounded by North Wall Quay, Castleforbes Road, New Wapping Street and Mayor Street Upper, Dublin 1
DSDZ4465/18Dublin CityLodged 23 Nov 2018Infrastructure
- Granted70 m away
Permission for development at the Central Bank of Ireland Headquarters, North Wall Quay, Dublin 1, D01 F7X3…
Central Bank of Ireland, North Wall Quay, Dublin 1, D01 F7X3
DSDZ2926/19Dublin CityLodged 7 May 2019Other
- Granted80 m away
The development will consist of the installation of roof-mounted solar photovoltaic panels to include all…
3 Dublin Landings, North Wall Quay, Dublin 1
DSDZ5054/22Dublin CityLodged 18 Oct 2022Energy
- Invalid80 m away
The development will consist of the installation of roof-mounted solar photovoltaic panels to include all…
3 Dublin Landings, North Wall Quay, Dublin 1
DSDZ4944/22Dublin CityLodged 28 Sept 2022Energy
- Invalid90 m away
SFDC Ireland Ltd. intend to apply for planning permission for development at this c. 0.032ha site located at…
Site at the junction of North Wall Quay and New Wapping Street, Salesforce Tower, Station Square, Block 7, Spencer Dock, Dublin 1
WEBDSDZ5096/25Dublin CityLodged 27 Aug 2025Change of use
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedAlterations
Planning permission for development at this site generally bounded by North Wall Quay, Castleforbes Road, New…
Site generally bounded by North Wall Quay, Castleforbes Road, New Wapping Street and Mayor Street Upper, Dublin 1
DSDZ3199/22Dublin CityLodged 2 Feb 2022
- InvalidApartments
Planning permission for development at a site generally bounded by North Wall Quay, Castleforbes Road, Block…
Site bounded by North Wall Quay, Castleforbes Road, Project Wave Block D and Project Wave Block B, North Lotts, Dublin 1
DSDZ2353/18Dublin CityLodged 21 Feb 2018
- GrantedCommercial
Permission for development on a site of approximately 1.85 hectares at this site at North Wall Quay, Dublin —…
Site of approximately 1.85 hectares at North Wall Quay, Dublin 1. The site is principally bounded by: Mayor Street Upper to the north; North Wall Quay to the south; North Wall Avenue to the east; and Castleforbes Road to the west
DSDZ3042/19Dublin CityLodged 20 May 2019
- GrantedAlterations
This application relates to a proposed development within the North Lotts and Grand Canal Dock SDZ Planning…
generally bounded by North Wall Quay, Castleforbes Road, New Wapping Street and Mayor Street Upper, Dublin 1
DSDZ2116/20Dublin CityLodged 24 Jan 2020
- GrantedCommercial
Permission for development on a site of 0.4834ha to amend Block No. 2 of a previously permitted scheme (Reg.…
City Block 9, North Wall Quay, and Mayor Street Upper, Dublin 1
DSDZ4208/23Dublin CityLodged 24 Jul 2023
- GrantedCommercial
For development at this site: generally bounded by North Wall Quay, Castleforbes Road, Block D (under…
site: generally bounded by North Wall Quay, Castleforbes Road, Block D (under construction) and Block B (under construction), North Lotts, Dublin 1.
DSDZ4148/19Dublin CityLodged 7 Oct 2019
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.