Planning Permission Ireland
GrantedOtherDecided 1 July 2019

Central Bank of Ireland, North Wall Quay, Dublin 1, D01 F7X3

Installation of a 10.5-metre-high outdoor public art piece at the Central Bank of Ireland.

DSDZ2926/19 · Dublin City Council · Lodged 7 May 2019

Reference
DSDZ2926/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
7 May 2019

Summary

AI-generated

The development at the Central Bank of Ireland Headquarters consists of installing an outdoor public art piece. The piece will comprise an arched sculptured frame with an overall height of approximately 10.5 metres and a span of 14 metres.

Otherartpublic realm

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development at the central bank of ireland headquarters, north wall quay, dublin 1, d01 f7x3 at the northeast corner / rear part of the site. This application relates to a proposed development within the north lotts & grand canal dock sdz planning scheme area. The development will consist of: permission for the installation of an outdoor public art piece comprising an arched sculptured frame with an overall height of c. 10.5 metres and span of c. 14 metres and ancillary site works. The piece will utilise mild steel and painted hi-gloss, multi-coloured and black stripe materials with a powder coated, spray and lacquer finish.

Land-use zoning

What this land is zoned for

Z14: Strategic Development and Regeneration Areas (SDRAs)RS
To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

National zoning type: Residential, mixed residential and other uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
3 Upper Mayor St, North Wall, Dublin 1May 2025€680,000133 m
64 Co-living Units, Block 2 Spencer Place (north), Mayor Street Spencer DockAug 2025€24,420,751189 m
94 Residential Units, Block 2 Spencer Place (north), Mayor Street Spencer DockAug 2025€40,915,762189 m
Apt 602 Longboat Quay North, Sir John Rogersons Quay, Dublin 2Feb 2026€700,000253 m
707 Longboat Quay North, Sir John Rogersons Quay, Dublin 2Jun 2025€620,000253 m
703 Longboat Quay North, Sir John Rogersons Quay, Dublin 2Sept 2025€385,000253 m
202 Residential Units, Block 1 Spencer Place (north), Mayor Street Spencer DockAug 2025€88,452,722259 m
134 Longboat Quay North, Sir John Rogersons Quayprice excludes VATJan 2010€225,000261 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 May 2019
  2. Decision due1 July 2019
  3. Decision issued1 July 2019
  4. Grant issued1 December 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.