Planning Permission Ireland
GrantedChange of useDecided 31 October 2019

Unit 14, Packenham House, Park Lane and Sheriff Street, Spencer Dock, Dublin 1

Change of use from a retail unit to a crèche at Spencer Dock.

DSDZ3949/19 · Dublin City Council · Lodged 6 September 2019

Reference
DSDZ3949/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
6 September 2019

Summary

AI-generated

The application seeks permission to convert an existing 420 sq.m retail unit into a crèche at Packenham House. The development includes a 44 sq.m external enclosed play area, internal reconfigurations, and new facade signage.

Change of usecrechechange of usechildcare
Floor area
420 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Planning permission for change of use for an existing retail use to crèche. The application relates to a development within a strategic development zone planning scheme area (north lotts and grand canal dock). The proposed development comprises of
  • Change of us from retail to crèche (420m2)
  • External enclosed play area (44m2) associated with crèche
  • Façade signage to park lane and sheriff street
  • Internal reconfiguration to provide for classrooms, sleeping room, staff, cooking, and washing facilities
  • All associated site development works necessary to facilitate the development

Land-use zoning

What this land is zoned for

Z14: Strategic Development and Regeneration Areas (SDRAs)RS
To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

National zoning type: Residential, mixed residential and other uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 30 March 2020.

Notified floor area: 464

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
8 Packenham House, Spencer Dock, Dublin 1Feb 2025€462,0004 m
19 Pakenham House, Spencer Dock, IfscApr 2026€482,0004 m
7 Pakenham House, Spencer Dock, Dublin 1May 2026€500,0004 m
13 Pakenham House, Spencer Dock, Wall Quay North Dublin 1May 2025€490,0004 m
6 Riverstown House, Spencer Dock, Dublin 1May 2025€418,20017 m
Apt 21 - Riverstown House, Spencer Dock, Dublin 1May 2026€412,00021 m
4 Copebridge House, Spencer Dock, Dublin 1Jun 2025€310,00043 m
2 Copebridge House, Spencer Dock, Wall Quay North Dublin 1Mar 2025€297,00043 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 September 2019
  2. Decision due31 October 2019
  3. Decision issued31 October 2019
  4. Grant issued31 October 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.