Planning Permission Ireland
GrantedApartmentsDecided 22 November 2019

City Block 2, Spencer Dock, Dublin 1.The site is bound by Sheriff Street Upper to the north, Mayor Street Upper to the south, New Wapping Street to the east and a development site to the west (also part of Block 2)

Amendments to a permitted development, reducing the number of apartments from 349 to 326.

DSDZ4111/19 · Dublin City Council · Lodged 30 September 2019

Reference
DSDZ4111/19
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
30 September 2019
Floor area
100 m²

Summary

AI-generated

The application proposes amendments to a previously permitted development at Spencer Dock. The changes include reconfiguring the residential layout to reduce the total number of apartment units from 349 to 326, and removing the southern elevation of Block 1 over the pumping station.

Apartmentsapartmentsdocklandsamendment
Residential units
326

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Planning permission for amendments to previously permitted development, reg. Ref. Dsdz2896/18 and as amended by dsdz4279/18 at a site of 1.26 hectares located at city block 2, spencer dock, dublin
  • The site is bound by sheriff street upper to the north, mayor street upper to the south, new wapping street to the east and a development site to the west (also part of block 2). The subject site also includes the existing operational north lotts pumping station and its associated infrastructure. The application relates to a proposed development within a strategic development zone planning scheme area, north lotts and grand canal dock sdz. The proposed development comprises of amendments to previously permitted development reg. Ref. Dsdz2896/18 and as amended by reg. Ref. Dsdz4279/18 comprising of
  • Reconfiguration of the permitted residential development, reducing the number of apartment units from 349 no. To 326 no. Comprising of (163 no. 1 beds and 163 no. 2 bed units)
  • Removal of the southern elevation of block 1 over the irish water pumping station
  • Block 1 will comprise of 201 no. Residential units (96 no. 1 beds and 105 no. 2beds)
  • Block 2 will comprise of 125 no. Residential units (67 no 1 beds and 58 no. 2 beds) and an aparthotel of 100 no. Bedrooms. (there is no change to the number of bedrooms proposed within the aparthotel)
  • Amendments to the façade and elevational treatment to provide for revised balconies and modulation
  • The proposed amendments will result in revisions to all elevations including revised location and provision of private balconies/terraces
  • Provision of link bridge at 6th storey (5th storey) connecting block 1 and block 2
  • Revised location and increase in internal residential amenity space associated with the development and the provision of external communal roof terraces
  • Revised under croft layout and increase in area by 366 sq. M. Overall (an increase of 416sqm on block 1and a decrease of 50sqm on block
  • To include 78 no. Car parking spaces and 726 no. Cycle parking spaces; and an increase in plant area
  • Revised landscaping throughout the scheme as a result of the proposed amendments and revised boundary treatments along the street frontages
  • Provisions of 102 no. Surface level visitor bicycle parking spaces
  • The development also includes, suds drainage, the provision of a green roof on both blocks, revised plant at roof level, consequential minor amendments and all associated site development works necessary to facilitate the development

Land-use zoning

What this land is zoned for

Z14: Strategic Development and Regeneration Areas (SDRAs)RS
To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

National zoning type: Residential, mixed residential and other uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
202 Residential Units, Block 1 Spencer Place (north), Mayor Street Spencer DockAug 2025€88,452,72263 m
3 Upper Mayor St, North Wall, Dublin 1May 2025€680,00083 m
94 Residential Units, Block 2 Spencer Place (north), Mayor Street Spencer DockAug 2025€40,915,762120 m
64 Co-living Units, Block 2 Spencer Place (north), Mayor Street Spencer DockAug 2025€24,420,751120 m
Apt 13 Canon Hall, Church St East, Dublin 3Apr 2026€531,750127 m
6 Canon Hall, Church St East, Dublin 3May 2025€320,000127 m
32 Canon Hall, Church St East, Dublin 3Jun 2025€338,000127 m
28 Canon Hall, Church St East, Dublin 3May 2026€345,000127 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received30 September 2019
  2. Decision due22 November 2019
  3. Decision issued22 November 2019
  4. Grant issued22 November 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.