Planning Permission Ireland
GrantedApartmentsDecided 18 December 2018

City Block 2, Spencer Dock, Dublin 1

Amendments to a permitted development to increase the total number of apartments to 349 units across two blocks.

DSDZ4279/18 · Dublin City Council · Lodged 26 October 2018

Reference
DSDZ4279/18
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
26 October 2018

Summary

AI-generated

This application seeks permission for amendments to a previously permitted development within a Strategic Development Zone. The changes involve internal reconfigurations of Block 1 and Block 2 to increase the total number of residential units from 322 to 349 apartments.

Apartmentssdzapartmentsamendment
Residential units
349

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Planning permission for amendments to previously permitted development, reg. Ref. Dsdz2896/18 at a site of 1.26 hectares located at city block 2, spencer dock, dublin
  • The site is bound by sheriff street upper to the north, mayor street upper to the south, new wapping street to the east and a development site to the west (also part of block 2). The development site also includes the existing operational north lotts pumping station and its associated infrastructure - the proposed development involved building adjacent to, and over, the pumping station. The application relates to a proposed development within a strategic development zone planning scheme area. The proposed development comprises of amendments to previously permitted development dsdz2896/18 comprising of: - internal re-configuration of the previously permitted block 1 and block 2 to provide for 349 no. Residential units (174 no. 1 beds and 175 no. 2 beds) increasing the permitted total from 322 no. 349 no. Units; - block 1 will comprise of 222 no. Units (105 no. 1 beds and 117 no. 2 beds); - block 2 will comprise of 127 no. Units (69 no. 1 beds 58 no. 2 beds); - the revised block layout will result in amendments to all elevations including revised location and provision of private balconies/ terraces and revised resident amenity facilities; - revised under croft layout and increase in area to include an increase in car parking spaces from 77 no. Car parking spaces to 80 no. Car parking and increase in bicycle parking from 462 no. Spaces to 524 no. Spaces and an increase in plant area; - revised aparthotel layout to provide for 100 no. Units (240 no. Bed spaces); - provision of mezzanine level between ground and first floor level to include an extension to the cafe space permitted at ground floor level and ancillary office area to serve the aparthotel development; - provision of mezzanine level to 8 no. Ground floor aparthotel units; - revised landscaping and boundary treatment; - revision to plant at roof level; - the proposed amendments will not result in an increase in the permitted maximum building height; - the development also includes, suds drainage, the provision of a green roof on both blocks and all associated site development work necessary to facilitate the development

Land-use zoning

What this land is zoned for

Z14: Strategic Development and Regeneration Areas (SDRAs)RS
To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

National zoning type: Residential, mixed residential and other uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 15 November 2018. A completion certificate was lodged on 31 August 2022.

Notified floor area: 32,920

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
202 Residential Units, Block 1 Spencer Place (north), Mayor Street Spencer DockAug 2025€88,452,72263 m
3 Upper Mayor St, North Wall, Dublin 1May 2025€680,00083 m
94 Residential Units, Block 2 Spencer Place (north), Mayor Street Spencer DockAug 2025€40,915,762120 m
64 Co-living Units, Block 2 Spencer Place (north), Mayor Street Spencer DockAug 2025€24,420,751120 m
Apt 13 Canon Hall, Church St East, Dublin 3Apr 2026€531,750127 m
6 Canon Hall, Church St East, Dublin 3May 2025€320,000127 m
32 Canon Hall, Church St East, Dublin 3Jun 2025€338,000127 m
28 Canon Hall, Church St East, Dublin 3May 2026€345,000127 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 October 2018
  2. Decision due20 December 2018
  3. Decision issued18 December 2018
  4. Grant issued18 December 2018

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.