Planning Permission Ireland
GrantedApartmentsDecided 9 May 2024

Former IDA Centre, Prussia Street, Dublin 7, D07 T868, D07 DP96, D07 YK11

Demolition of four warehouses to build a 373-bed student accommodation development with a ground floor café on Prussia Street.

LRD6050/24-S3 · Dublin City Council · Lodged 15 March 2024

Reference
LRD6050/24-S3
Authority
Dublin City Council
Register status
Appealed
Type
Large Residential Development
Received
15 March 2024

Summary

AI-generated

The proposed development consists of the demolition of existing warehouse structures to construct a student accommodation scheme. It will feature two apartment blocks ranging from 3 to 5 storeys and a single terrace of studio units, providing 43 apartments and 123 studio apartments. The scheme also includes a ground floor café, internal student amenities, and bicycle parking.

Apartmentsstudent housingdemolitioncafé
Storeys
5

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission the proposed development will consist of: the demolition of the existing 4 no. Warehouse structures to provide for the construction of a 373 bed purpose-built student accommodation development, a ground floor café, and all ancillary site development works. The proposed development will be provided in 2 no. Apartment blocks ranging in height from 3-5 storeys over basement and a single terrace of own door studio units, including 43 no. Apartments ranging in size from 4-6 bedrooms (250 no. Bed spaces), 123 no. Studio apartments all served by bicycle parking in a dedicated bike store, bin store, plant rooms, outdoor amenity spaces and internal student amenity facilities, esb substation, rooftop mounted plant and pv panels. The primary access to the proposed development will be provided from prussia street to the east. The proposed development also provides for the alterations of section of the western boundary wall to provide for fencing and a gate to facilitate a maintenance access for dublin city council from drumalee court.

Key dates

Timeline

  1. Application received15 March 2024
  2. Decision due9 May 2024
  3. Decision issued9 May 2024
  4. Appeal submitted4 June 2024
  5. Appeal decided18 September 2024
  6. Permission expiry1 November 2029

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.