GrantedApartmentsDecided 25 March 2026

Park Shopping Centre and 42-45, Prussia Street, Dublin 7 (ABP-309657-21)

Extension of duration for a major mixed-use development including student housing, build-to-rent apartments, and retail in Dublin 7.

SHD0007/21/XA · Dublin City Council · Lodged 30 January 2026

Reference
SHD0007/21/XA
Authority
Dublin City Council
Register status
Decided
Received
30 January 2026

Summary

AI-generated

An extension of duration is sought for a strategic housing development involving the demolition of the Park Shopping Centre and adjacent buildings. The proposed scheme features student housing, build-to-rent apartments, a supermarket, and retail units in buildings up to 8 storeys, with works affecting a protected structure boundary wall.

Apartmentsstudent housingbuild to rentretailprotected structure

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Ext. Of duration: we, the park shopping centre limited, intend to apply to an bord pleanála for permission for a strategic housing development at this site at park shopping centre & 42-45 prussia street, dublin
  • The development will consist of the following
  • (1) demolition of the existing park shopping centre and nos. 42-45 prussia street, dublin7 and creation of portal openings in the former boundary wall (protected structure); (2) construction of a new mixed use district centre, student residential housing and build-to-rent housing development in 2 buildings, a south building and a north building, separated by a new pedestrian and bicycle street connecting prussia street with the emerging grangegorman sdz campus. The buildings will range in height from 3-5 storeys on prussia street to 6-storeys (south building) and 8-storeys (north building) towards to gda campus. (3) district centre development accommodating: -
  • Part-licensed supermarket, 11 no. Retail/non-retail service units and 2 no. Licensed café/restaurant units at ground floor
  • Two vehicular entrances from prussia street to provide access for deliveries and services (south entrance) and to provide access to undercroft parking and van deliveries (north entrance)
  • Standing areas for deliveries and waste collection in designated service yards (south building) and for car parking for 111 no. Cars, light van deliveries and bicycle parking (north building)
  • All associated ancillary facilities, landscaping and boundary treatments including acoustic attenuation measures where required. (4) student residential accommodation overhead the district centre accommodating 11no. Student houses comprising 143 no. Apartments (including 28 no. Studios), with a total of 584 bedspaces (556 bedrooms) and associated balconies
  • The north building student residential accommodation has reception and student amenities (concierge, café, lounge areas) at ground, mezzanine and first floor levels, with access to all levels overhead and a first floor level podium garden from which student apartments and student amenity areas (study centre, a recreation centre and laundry) are accessible; 2 no. Amenity terraces with pergola structures at fourth floor
  • The south building student residential accommodation has ground floor level foyer with access to all levels, staff rooms, fitness centre at ground and mezzanine levels and a first floor level podium garden from which student apartments are directly accessible. (5) build-to-rent residential accommodation overhead the supermarket with lift and stair access from prussia street, comprising 29 no. Apartments with balconies (28 no. 2 bedroom and 1 no. 3 bedroom units) and 3 no. 2 bedroom townhouses, laundry room, lounge/games room, bicycle store, waste store and podium garden with conservatory allotments
  • The proposed new street will connect to the grangegorman sdz campus via a portal connection through a former boundary wall
  • The development includes art display along the new street, landscaping, boundary treatments, signage, plant and substations, and all associated site works and services

Key dates

Timeline

  1. Application received30 January 2026
  2. Decision due26 March 2026
  3. Decision issued25 March 2026

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.