Awaiting decisionInfrastructureDecided 11 March 2026

The proposed 3no. underground cable routes, or sections of cable routes in Dublin City are located in the Ashtown, Glasnevin and North Wall areas as follows:, The proposed Coolmine cable route section connecting the permitted Ashtown 38 kV substation (AC

Installation of 3.72km of underground electricity cables across Dublin City.

WEB1097/26 · Dublin City Council · Lodged 22 December 2025

Reference
WEB1097/26
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
22 December 2025

Summary

AI-generated

The ESB is seeking a 10-year permission to install approximately 3.72 kilometres of 38kV underground cables. The works will span across three routes in the Ashtown, Glasnevin, and North Wall areas.

Infrastructureelectricityinfrastructureesb

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The electricity supply board (esb) intends to apply for permission for a 10-year approval for development at this site consisting of up to approximately 3.72 kilometres (km) of 38 kilovolts (kv) underground cable (ugc) across 3 no. Routes at different locations in dublin city with a total site area of c. 4.23ha. The proposed ugc are located at the ashtown, glasnevin and north wall areas within dublin city. The proposed development consists of the following elements
  • Installation of 3no. New 38 kv underground cable routes, or cable route sections, and all associated site and development works within the administrative area of dublin city council (dcc) as outlined below and illustrated on the maps herein: - the proposed coolmine cable route section within dcc is approximately 1.14km in length connecting the permitted ashtown 38 kv substation (acp ref. 314232) to the county border with fingal at navan road (r147). - the proposed glasnevin cable route is wholly within dcc and is approximately 1.2km in length connecting the existing glasnevin 38kv substation to the permitted clareville 38kv substation (acp ref. 314232). - the proposed north quays cable route is wholly within dcc and is approximately 1.38km in length connecting the permitted spencer dock 38kv substation (acp ref. 314232) with the existing 38 kv circuit on east wall road (r131). The primary purpose of the proposed underground cables is to provide electrical power to the dart+ west railway project as granted under the dart+ west railway order (acp ref. 314232). The proposed underground cable routes will incorporate the following elements
  • Communication links and fibre optic cables between all substations in the same trench as the ugc
  • Joint bays and communication chambers along the ugc alignment
  • Temporary construction laydown and work areas with ancillary staff facilities and parking, temporary access tracks, passing bays and water and utility crossings
  • All associated and ancillary above and below ground site development works, including works comprising or relating to permanent and temporary construction and roadworks and excavation (including hdd) and vegetation clearance. Refer to the enclosed site and newspaper notices for a full description of development for the maps attached

Land-use zoning

What this land is zoned for

Z15: Community and Social InfrastructureCI
To protect and provide for community uses and social infrastructure.

National zoning type: Mixed/general community services/facilities uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
12 Dakota Court, Royal Canal Bank, PhibsboroughJul 2025€306,00076 m
23 Dakota Court, Royal Canal Bank, Phibsborough Dublin 7Dec 2025€314,10076 m
66 Dakota Court, Dakota Building, PhibsboroOct 2025€360,00076 m
1 Blacquiere Villas, Phibsboro, Dublin 7Sept 2025€522,000135 m
3 Wigan Rd, Drumcondra, DublinMay 2026€905,000146 m
53 Whitworth Rd, Glasnevin, Dublin 9Apr 2025€590,000153 m
15 Blacquire Villas, Phisboro, Off North Circular Rd Dublin 7Apr 2025€495,000163 m
14 Villa Bank, Phibsborough, Dublin 7Apr 2026€651,000184 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received22 December 2025
  2. Decision due12 March 2026
  3. Decision issued11 March 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.