Planning Permission Ireland
Awaiting decisionInfrastructureDecision was due 3 October 2025

Railway between Dublin City Centre, and Drogheda, (Circa 50km), Fingal, Co Dublin

Major railway works are proposed to upgrade and electrify the DART line between Dublin City Centre and Drogheda.

SID/05/24 · Fingal County Council · Lodged 19 July 2024

Reference
SID/05/24
Authority
Fingal County Council
Register status
In progress
Received
19 July 2024

Summary

AI-generated

The DART+ Coastal North project involves extending the 1500V DC electrification from Malahide to Drogheda. Works include installing overhead line equipment, upgrading signalling and power supplies, building new electrical substations, and modifying bridges.

Infrastructurerailwaydartinfrastructureelectrification

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The dart+ coastal north project will involve railway works and all works necessary to enable the construction, operation, maintenance and improvement of the railway between dublin city centre and drogheda (circa 50km). The works will generally comprise, but are not limited to the following elements which are described within this schedule
  • Extension of existing 1500v dc electrification, which currently terminates at malahide, as far as drogheda macbride station (approximately 37km)
  • The installation of foundations, masts, and overhead wires to supply power to the railway
  • Upgrades to existing signalling, telecoms, and power supplies to support the planned increase in train services, including the introduction of new electrical substations at key locations alongside the railway line at drogheda, bettystown, gormanston, balbriggan, skerries north, skerries south, rush & lusk and donabate
  • An overhead line equipment (ohle) maintenance compound at rush and lusk station
  • Undertaking improvements / modifications to bridges spanning the railway arising from track reconfigurations and / or meeting required electrical clearances
  • Undertaking localised bridge modifications to enable ohle to be fixed to bridges carrying the railway
  • Canopy modifications at drogheda macbride station to accommodate ohle clearances and modified railway boundary fences to protect the public from contacting the overhead line
  • Infrastructure works to facilitate the increase in service frequency and capacity, in specific areas of intervention including: works around howth junction & donaghmede station; works around clongriffin station; works around malahide station & viaduct; works to the existing user worked level crossing (xb001) south of donabate; and works around drogheda macbride station
  • Modifications to existing depots at drogheda and fairview to support the new train fleet, including the provision of additional train stabling at drogheda
  • Ancillary civils, utility diversions, drainage, and power work to cater for the changes this schedule 1 is intended to be read in conjunction with the plan of the railway works – the referenced railway works drawings (which includes property details drawings, alignment details drawings and structural details drawings) which set out more particularly the railway works and which form part of this railway order. The description of the works is divided into the 23 no. Different railway order areas for clarity and progresses from the southern end of the scheme at clontarf road station and surrounds, to the termination of the scheme at drogheda macbride station and surrounds. Abp ref: abp-320164-24

Key dates

Timeline

  1. Application received19 July 2024
  2. Decision due3 October 2025

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.