Planning Permission Ireland
InvalidRetentionDecided 19 January 2026

35 Merrion Square East, Dublin 2

Retention of extensive restoration and repair works at a protected Merrion Square building.

WEB1098/26 · Dublin City Council · Lodged 15 January 2026

Reference
WEB1098/26
Authority
Dublin City Council
Register status
Decided
Type
Retention Permission
Received
15 January 2026

Summary

AI-generated

Retention permission is sought for lime mortar re-pointing, replacement of basement wall plaster with lime render, and structural stabilization. The works also include new ground floor sanitary facilities and a new lantern-style rooflight.

Retentionretentionprotected structurerestoration

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure / retention: stadia capital limited intend to apply for retention permission for development at this site no. 35 merrion square east, dublin 2, d02 kh30, a protected structure, on the corner of lower mount street, dublin 2,. The development consists of
  • The re-pointing of the entire external walls in lime mortar with a wig and tuck finish including the removal of the sand/cement render to the basement walls and its replacement with lime render with a wood float finish
  • The removal of hard wall plaster to the walls and ceilings in the basement and its replacement with lime mortar render
  • The installation of new sanitary facilities on the ground floor
  • The removal of the pvc rooflight over the stairwell and its replacement with a new lantern style rooflight
  • Mechanical and electrical services upgrade works
  • Necessary structural interventions to stabilise floors and walls. And all ancillary works

Land-use zoning

What this land is zoned for

Z8: Georgian Conservation Areas
To protect the existing architectural and civic design character, and to allow only for limited expansion consistent with the conservation objective.

National zoning type: General

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
6 Mount Street Lower, Dublin 2Apr 2026€1,450,00040 m
Appartment 2, 18 - 21 Mount Street Lower, Dublin 2May 2026€750,000141 m
Apt. 18, 18/21 Mount St Lower, Dublin 2Feb 2025€805,000151 m
Apt 1, Ground Floor, 1 Mount Street UpperJul 2025€1,825,000152 m
19 Madison Court, Off Grattan St, Dublin 2Jun 2026€406,000160 m
5 Grattan Court, Lower Mount Street, Dublin 2Dec 2025€475,000167 m
14 Grants Row, Off Lower Mount St, Dublin 2Jul 2025€540,000180 m
Apt 5 Holemeade House, Holles St, Dublin 2Jun 2025€390,000181 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received15 January 2026
  2. Decision due12 March 2026
  3. Decision issued19 January 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.