Planning Permission Ireland
GrantedExtensionDecided 12 July 2023

12, Greenlea Park, Terenure, Dublin 6w

Demolition of rear extensions and construction of a new ground and first-floor rear extension, plus garage conversion.

WEB1210/23 · Dublin City Council · Lodged 10 March 2023

Reference
WEB1210/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
10 March 2023

Summary

AI-generated

The project involves demolishing a 12sqm kitchen extension and an 11sqm sunroom to the rear. A new ground and first-floor rear extension will be built, the garage will be converted to habitable space with a new bay window, and the existing attic dormer window will be removed.

Extensionextensiongarage conversiondemolition
Storeys
2
Floor area
87 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of widening of the existing vehicular entrance, the demolition of 12sqm existing kitchen extension and 11sqm existing sunroom, both to the rear, and construction of a new ground and first floor extension to the rear, to provide extended kitchen/living/dining area at ground floor and to allow reconfiguration and extension of bedrooms at first floor level. It is also proposed to convert the garage to habitable space - to construct a new bay window in lieu of the existing garage door - and to remove the existing dormer window at attic level. The combined floor area of the proposed works is 87sqm.

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 13 November 2023.

Notified floor area: 87

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
2 Greenlea Park, Terenure, Dublin 6wMay 2025€1,375,00051 m
102 Parkmore Drive, Terenure, Dublin 6 WJul 2026€847,00083 m
137 Greenlea Rd, Terenure, Dublin 6wApr 2025€770,00095 m
Araglen, 157 Greenlea Rd, Terenure Dublin 6wJul 2025€1,125,000118 m
94 Greenlea Rd, Terenure, Dublin 6wJun 2025€1,140,000123 m
115 Greenlea Rd, Dublin 6w, DublinMay 2026€925,000165 m
4 Greenlea Dr, Terenure, Dublin 6wApr 2026€537,500172 m
69 Lavarna Grove, Terenure, Dublin 6wJun 2026€1,386,000180 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received10 March 2023
  2. Decision due12 July 2023
  3. Decision issued12 July 2023
  4. Permission expiry11 October 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.