Planning Permission Ireland
GrantedExtensionDecided 11 July 2023

84, Greenlea Road, Terenure, Dublin 6w D6W PR68

Conversion of a garage, construction of a first-floor side extension, and an attic conversion with a rear dormer.

WEB1414/23 · Dublin City Council · Lodged 17 May 2023

Reference
WEB1414/23
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
17 May 2023

Summary

AI-generated

The development includes converting the existing garage into habitable space and building a new first-floor extension to the side. The attic will be converted to non-habitable space with a new zinc-clad rear dormer. External insulation will also be applied to the existing house.

Extensionextensionattic conversioninsulation
Floor area
172 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

A) conversion of existing original garage to habitable accommodation, b) construction of a new first floor extension to the side, c) conversion of extended attic space to non-habitable accommodation along with the construction of a new zinc clad dormer box extension to the rear of main roof and 2 no. Rooflights to the side, d) external insulation to existing house (no change to existing finishes) e) consequential internal and minor elevational alterations f) all associated site & landscaping works including new covered and enclosed bicycle storage in front garden, at 84 greenlea road, terenure, dublin 6w, d6wpr68 and will result in an increase of the total habitable floor area from 140.5sq. M to 171.9sq. M and the creation of 33.4 sq. M. Of non-habitable accommodation at attic floor level

Land-use zoning

What this land is zoned for

Z1: Sustainable Residential NeighbourhoodsRS
To protect, provide and improve residential amenities.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 13 September 2023.

Notified floor area: 64.8

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
84 Greenlea Rd, Terenure, Dublin 6wFeb 2025€1,225,0006 m
14 Greenlea Place, Terenure, Dublin 6wNov 2025€580,00017 m
4 Greenlea Dr, Terenure, Dublin 6wApr 2026€537,50037 m
115 Greenlea Rd, Dublin 6w, DublinMay 2026€925,00065 m
94 Greenlea Rd, Terenure, Dublin 6wJun 2025€1,140,00071 m
62 Greenlea Rd, Terenure, Dublin 6wDec 2025€1,200,000136 m
54 Parkmore Dr, Terenure, Dublin 6wSept 2025€1,325,000143 m
137 Greenlea Rd, Terenure, Dublin 6wApr 2025€770,000162 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received17 May 2023
  2. Decision due11 July 2023
  3. Decision issued11 July 2023
  4. Permission expiry5 October 2028

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.