Planning Permission Ireland
RefusedAlterationsDecided 20 April 2026

162-165, Phibsborough Road, Phibsborough, Dublin 7, D07RX3P

Retention of existing signage and installation of new backlit signs at a restaurant in Phibsborough.

WEB1466/26 · Dublin City Council · Lodged 27 February 2026

Reference
WEB1466/26
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
27 February 2026

Summary

AI-generated

The application seeks retention permission for existing metal doorway signage at Borgo Restaurant, which is a protected structure. It also seeks permission to install two new projecting stainless steel back-lit signs on the first-floor corner of the building.

Alterationssignagerestaurantheritage

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure:permission and retention : retention permission for development at borgo restaurant, 162–165 phibsborough road, phibsborough, dublin 7, d07 rx3p (protected structure). The development will consist of
  • Retention permission for existing metal doorway signage
  • Permission for the installation of 2 no. New projecting stainless steel back-lit signs on the north-west corner of the building at first-floor level facing onto the north circular road and phibsborough road, and
  • All associated site works

Land-use zoning

What this land is zoned for

Z4: Key Urban Villages/Urban VillagesDC
To provide for and improve mixed-services facilities.

National zoning type: District, neighbourhood centre

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
170 Phibsboro Road, Phibsboro, Dublin 7Apr 2025€180,00040 m
Apt 1 368 North Circular Road; And, 364/366/368/370/372a/372b, 374 North Circular RoadMar 2025€800,00054 m
Apt Rear, 53 Phibsboro Rd, Dublin 7Jun 2025€220,00082 m
27 St Peters Sq, Phibsborough Rd, Phibsborough Dublin 7Jan 2025€395,00089 m
52 Phibsboro Rd, Phibsboro, Dublin 7Nov 2025€550,00093 m
348 North Circular Rd, Phibsboro, Dublin 7Feb 2025€283,50095 m
8 Goldsmith Street, Phibsborough, Dublin 7Jul 2025€549,000114 m
10 Goldsmith St, Phibsborough, Dublin CityJan 2026€805,000120 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received27 February 2026
  2. Decision due23 April 2026
  3. Decision issued20 April 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.