Planning Permission Ireland
InvalidAlterationsDecided 1 October 2024

39 Mountjoy Square, Dublin 1

Restoration works and retention of internal linings at a protected structure on Mountjoy Square.

WEB2195/24 · Dublin City Council · Lodged 26 September 2024

Reference
WEB2195/24
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
26 September 2024

Summary

AI-generated

The development consists of restoration and preservation works to the brick facades, front steps, railings, and entrance hall of a protected structure. Retention permission is also sought for internal wall and ceiling linings, including breathable insulation, in the basement and ground floor.

Alterationsheritagerestorationretention

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure. Permission & retention. The development will consist of restoration and preservation works to the brick facades including repair, re-pointing, and consolidation of the brickwork, rendering in lime plaster to the rear return, the cleaning and the re-pointing of the front steps, the repair of the railings to the front, retiling of the entrance hall and replacement of rainwater goods and doors to basement. Retention permission is sought for the installation of internal linings to the basement and ground floor level return walls and ceilings, including breathable insulation and plasterboard to basement walls internal walls.

Land-use zoning

What this land is zoned for

Z8: Georgian Conservation Areas
To protect the existing architectural and civic design character, and to allow only for limited expansion consistent with the conservation objective.

National zoning type: General

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Apt. No. 84, 35 Mountjoy Square, Dublin 1Jan 2026€310,00029 m
Apt 7 33 Mountjoy Sq, Dublin 1, DublinApr 2026€292,00068 m
Apt 31, 33 Mountjoy Sq, Dublin 1May 2025€250,00071 m
Apt 32, 33 Mountjoy Sq, Dublin 1Jun 2025€250,00071 m
Apt 42, 33 Mountjoy Sq, Dublin 1Apr 2026€259,00071 m
Apt 62, Stapleton House, 33 Mountjoy SqMay 2026€270,00071 m
Apt 2, 33 Mountjoy Sq, Dublin 1Mar 2025€400,00077 m
Apt 91 Pemberton, 33 Mountjoy Square, Dublin 1Mar 2025€235,00086 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received26 September 2024
  2. Decision due20 November 2024
  3. Decision issued1 October 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.