Planning Permission Ireland
InvalidAlterationsDecided 25 August 2025

6 Parkgate Street, Dublin 8

Essential repairs and alterations to a three-storey protected structure on Parkgate Street.

WEB2946/25 · Dublin City Council · Lodged 11 June 2025

Reference
WEB2946/25
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
11 June 2025

Summary

AI-generated

The development consists of essential repair works to the external envelope of a three-storey protected structure. It includes the demolition of a second-floor rear toilet outshot, replacement of all windows with sliding sash units, full re-rendering of front and rear elevations, and new internal building services.

Alterationsconservationheritagerepair
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Protected structure: the development will consist of essential repair works to the external envelope, the repair of existing defects (following on from essential crack stitching works already undertaken, dcc ref. No. 0240/24) to enhance and conserve an existing three storey protected structure as follows
  • Demolition and removal of a twentieth century toilet outshot from the rear elevation, of the second-floor
  • Replacement of all existing windows throughout with new sliding sash units, in keeping with the character of the building
  • Full re-rendering of the front and rear elevations using appropriate materials
  • Installation of new internal building services, including plumbing, mechanical and electrical systems
  • All associated internal alterations, drainage, and ancillary works

Land-use zoning

What this land is zoned for

Z5: City CentreUC
To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

National zoning type: City/Town/village Centre, central area

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
56 Montpelier Hill, Arbour Hill, Dublin 7Jan 2026€625,000107 m
18 Dawson Place, Arbour Hill, Dublin 7Aug 2025€726,000133 m
49f Arbour Hill Court, Units 1 To 13, Dublin 7May 2025€3,550,000139 m
Montpelier, Dublin 7not full market price · price excludes VATJan 2026€225,000,000175 m
9 Montpelier Court, Infirmary Rd, Dublin 7Jun 2026€615,000186 m
Apt 2, 27 Parkgate St, Dublin 8Mar 2025€166,666211 m
Apt 3, 27 Parkgate St, Dublin 8Mar 2025€166,667211 m
Apt 1, 27 Parkgate St, Dublin 8Mar 2025€166,666211 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received11 June 2025
  2. Decision due16 October 2025
  3. Decision issued25 August 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.