Planning Permission Ireland
GrantedIndustrialDecided 8 December 2025

Diageo Brewery, bounded by James's Street, Watling Street, Victoria Quay and Steven's Lane, Dublin 8

Demolition of a silo and construction of a brewhouse extension at the Diageo Brewery.

WEB5400/25 · Dublin City Council · Lodged 29 September 2025

Reference
WEB5400/25
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
29 September 2025

Summary

AI-generated

Permission is sought for works at a protected structure, including the demolition of an existing silo and the erection of a 25.15m high extension to the northern elevation of the brewhouse. The extension will provide storage for brewing materials and screen new silos.

Industrialbreweryprotected structuredemolitionsilo

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Protected structure: demolition of existing silo structure and other works on site and erection of an extension to the northern elevation of the brewhouse building to provide storage for brewing materials. The proposal will comprise silos screened to match the existing building. The proposed extension will extend 23.34m from the building and to a height of c. 25.15m, to match the existing building. It will be clad in a similar material to the existing building. The existing harp signage will be relocated to the north elevation of the proposed extension. And all associated works. The proposal is located within a site which has an approved ie (industrial emissions) licence (ref no. P0301-04).

Land-use zoning

What this land is zoned for

Z15: Community and Social InfrastructureCI
To protect and provide for community uses and social infrastructure.

National zoning type: Mixed/general community services/facilities uses

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
7a Basin Lane, James St, Dublin 8Jul 2026€420,000119 m
25 Saint James Walk, Rialto, Dublin 8Apr 2026€575,000197 m
111 Apartments At, The Lock Keeper's Quay Block 6, Grand Canal Harbourprice excludes VATMar 2025€45,228,496204 m
13 Longs Place, Longs Lane, Dublin 8Jul 2025€2,490,000215 m
25 Herberton 26 Jamess Walk, Rialto, Dublin 8Dec 2025€537,000216 m
Apt 24, 26 Jamess Walk, Rialto Dublin 8Jan 2025€263,000216 m
19 Longs Place, Rialto, Dublin 8May 2025€350,000218 m
Apt 11, 29 James Walk, Rialto Dublin 8Apr 2026€418,000225 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received29 September 2025
  2. Decision due8 December 2025
  3. Decision issued8 December 2025
  4. Permission expiry28 February 2031

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.