Planning Permission Ireland
GrantedNew dwellingDecided 28 May 2026

83 Sydney Parade Avenue, Dublin 4, D04 C2N6

Demolition of a house and construction of a new three-storey replacement home on Sydney Parade Avenue.

WEB5840/25 · Dublin City Council · Lodged 28 November 2025

Reference
WEB5840/25
Authority
Dublin City Council
Register status
Decided
Type
Permission
Received
28 November 2025

Summary

AI-generated

The development consists of the demolition of an existing two-storey, four-bedroom detached house. It will be replaced with a new three-storey, five-bedroom detached dwelling featuring an attached single-storey garage, attic storage, and two eastern terraces.

New dwellingdemolitionreplacement dwellingresidential
Residential unit
1
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

(i) the demolition of an existing two-storey, four-bedroom, pitched roof, detached dwelling; (ii) construction of a new three-storey, five-bedroom, pitched roof, detached replacement dwelling; (iii) provision of an attached single-storey, single-bay flat/green roof garage at ground floor level; (iv) provision of storage at attic level; (v) provision of 2 no. Terraces to the east (comprising 1 no. At first floor level with access to external stairs and 1 no. At second floor level); (vi) provision of an internal lift for accessibility; and (vii) all ancillary works including site clearance, hard and soft landscaping, boundary treatments, and suds measures, as necessary to facilitate the development. Vehicular and pedestrian access will be via the existing site entrance at sydney parade avenue.

Land-use zoning

What this land is zoned for

Z2: Residential Neighbourhoods (Conservation Areas)RS
To protect and/or improve the amenities of residential conservation areas.

National zoning type: Existing residential

Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
83 Sydney Parade Ave, Sandymount, Dublin 4Apr 2026€2,675,0008 m
1 Adelaide, Strand Rd, Sandymount Dublin 4Jun 2025€820,00047 m
33 Seabury, Sydney Parade Ave, Sandymount Dublin 4Feb 2025€575,00088 m
26 Seabury, Sandymount, Dublin 4Jul 2025€540,00088 m
45 Adelaide, Strand Rd, Sandymount Dublin 4Dec 2025€765,001112 m
43 Adelaide, Strand Rd, SandymountMay 2026€690,000124 m
77 Seabury, Sydney Parade, Dublin 4Aug 2025€385,000134 m
76 Seabury, Sydney Parade Ave, Dublin 4Apr 2025€525,000156 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received28 November 2025
  2. Decision due29 May 2026
  3. Decision issued28 May 2026
  4. Permission expiry16 August 2031

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.