“Jamestown Lands” comprising the factory sites of Haribo (Eircode D11 Y266), Sigma (Buildings 1 and 2, Eircode D11 PH2A), and unnamed warehouse buildings (Eircodes D11 E657 and D11 P2TT), Jamestown Business Park, Jamestown Road and McKee Avenue, Finglas
Large-scale residential development of 715 units following factory demolitions in Finglas.
WEBLRD6095/26-S3 · Dublin City Council · Lodged 30 March 2026
- Reference
- WEBLRD6095/26-S3
- Authority
- Dublin City Council
- Register status
- Decided
- Type
- Large Residential Development
- Received
- 30 March 2026
Summary
AI-generatedA seven-year permission is sought for a Large-Scale Residential Development on a 4.64-hectare site. The project involves the demolition of several factory buildings and the construction of 715 residential units, primarily consisting of apartments.
- Residential units
- 715
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Cairn homes properties limited, finglas regen ltd. , and finglas mckee property developments ltd. Intend to apply for a seven year permission for a large-scale residential development (lrd) at a site of c. 4.64ha at 'jamestown lands' comprising the factory sites of haribo (eircode d11 y266), sigma (buildings 1 and 2, eircode d11 ph2a), and unnamed warehouse buildings (eircodes d11 e657 and d11 p2tt), jamestown business park, jamestown road and mckee avenue, finglas, dublin
- The application site is bound by jamestown road to the east and mckee avenue to the west, and existing industrial buildings/ sites to the north and south. The proposal will comprise the demolition of 3 no. Existing buildings in full (including associated substations), and the partial demolition of 1 no. Building to enable the retention of the office building to the front. The existing office building will be retained and made good. Total area for demolition is c. 21,265sqm. The proposed development will comprise residential-led, mixed use development of 715 no. Residential units (comprising 320 no. 1-bed apartments, 376 no. 2-bed apartments, and 19 no. 3 bed units comprising 12 no. Townhouses, 4 no. Duplex apartments and 3 no. Apartments), c. 901sqm of retail/ commercial floor area, c. 2,578sqm of community/cultural/arts space, and a c. 560sqm creche (with 140sqm external area) and all open spaces, car and cycle parking and accesses as detailed below. The development will consist of
- Cell 1 will comprise of 3 no. Buildings and will provide a total of 105 no. Apartments and houses. Building 101 will comprise a terrace of 12 no. 3 bedroom back-to-back 3 storey town houses fronting onto mckee avenue. Building 102 (up to 5 storeys in height) will provide 44 no. Apartments (22 no. 1-bed units and 18 no. 2-bed units, and 4 no. 3-bed units). Building 103 (up to 6 storeys in height) will includes a retail unit of c. 327.9 sqm at ground floor level and 49 no. Apartments (25 no. 1-bed units, 21 no. 2-bed units and 3 no. 3-bed units). Cell 1 will also contain single storey bin stores, 4 single storey bicycle stores and an esb substation building
- Cell 2 will comprise 4 no. Buildings (above single level basement) and will provide a total of 182 no. Apartments. Building 201 (up to 6 storeys in height) will comprise 41 no. Apartments (5 no. 1 -beds and 36 no 2-beds) and a retail area of c. 573sqm at ground floor level. Building 202 (9 storeys in height) will comprise 88 no. Apartments (56 no. 1-bed units and 32 no. 2 bed units) and c. 906.2sqm of community/culture/ arts space at ground floor level. Building 203 (6 storeys in height) will comprise 53 no. Apartments (32 no. 1 bed units and 21 no. 2-bed units) and c. 384.8sqm of community/culture/ arts space at ground floor. External community/ culture/ arts space (c. 1,287 sqm) will also be provided. Building 204 will comprise a 2-storey creche (c. 560sqm with external area of 140sqm). Cell 2 will also contain 2no. Single storey bin store buildings and a single storey esb substation building
- Cell 3 will comprise 4 no. Buildings (above single level basement) and will provide a total of 252 no. Apartments. Building 301 (up to 7 storeys in height) will comprise 70 no. Apartments (48 no. 1-bed units, and 22 no. 2-bed units). Building 302 (7 storeys in height) will comprise 62 no. Apartments (7 no. 1-bed units and 55 no. 2-bed units). Building 303 (6 storeys in height) will comprise 55 no. Units, (41 no. 1-bed units, and 24 no. 2- bed units). Building 304 (up to 6 storeys in height) will comprise 55 no. Apartments (29 no. 1-bed units and 26 no. 2-bed units)
- Cell 4 will comprise 4 no. Buildings (above single level basement) and will provide a total of 176 no. Apartments. Building 401 (up to 6 storeys in height) will comprises 61 no. Units (11 no. 1-bed units, and 50 no. 2-bed units). Building 402 (6 storeys in height) will comprise 41 no. Apartments (17 no. 1-bed units and 24 no. 2 bed units). Building 403 (4 storeys in height) will comprise 47 no. Apartments (16 no. 1-bed units, and 31 no. 2-bed units). Building 404 (4 storeys in height) will comprise 27 no. Apartments (11 no. 1-bed units and 16 no. 2-bed units). A single storey esb substation building will be provided to the east of cell
- Provision of external communal open space comprising landscaped garden courtyards within each cell along with children’s play area and outdoor fitness area, bicycle parking and lift / stairs to access basement
- Provision of public open spaces comprising a public plaza, green routes, and a park area to the north including formal and informal play areas, bicycle parking areas provided throughout the surface level of the site
- Shared vehicular and bicycle access from mckee avenue and jamestown road. The proposed new road will provide linkages to the north and south as prescribed in the jamestown masterplan for sdra3.7. Provision of 491 no. Car parking spaces and 1,509 no. Cycle parking spaces at surface and basement levels for residents, businesses and visitors. Access ramp to the basement under cells 2
- 4 is provided at cell 3.8. All associated site development including: import, export and reuse of material to achieve appropriate levels; infrastructure and enabling works including water services provision and upgrades, public utilities, and road upgrade works on jamestown road; provision of green/blue roofs and roof mounted photovoltaic (pv) panels; telecommunications equipment; esb substations/switch rooms; ancillary storage and plant rooms; landscaping and boundary treatments; pedestrian accesses, and set down areas. An environmental impact assessment report (eiar) has been prepared in respect of the proposed development. All application documentation and information are available to view online at the following website set up by the applicant: www. Finglasregenlrdplanning. Com the planning application, and environmental impact assessment report (eiar) may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of dublin city council, planning department, block 4, ground floor, civic offices, wood quay, dublin 8 during its public opening hours (9.00a. M
- 4.30p. M. ) or on dublin city council website: www. Dublincity. Ie
Land-use zoning
What this land is zoned for
“To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.”
National zoning type: Residential, mixed residential and other uses
Objective set by the Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Recent sales nearby
within 500 m| Address | Date | Price | Distance |
|---|---|---|---|
| 108 Mckee Ave, Finglas, Dublin | Apr 2025 | €380,000 | 233 m |
| 50 Clearstream Court, Mckee Ave, Finglas Dublin 11 | Feb 2026 | €356,000 | 263 m |
| 56 Clearstream Court, Mckee Ave, Finglas Dublin 11 | Jan 2026 | €357,000 | 263 m |
| 24 Heath Sq, Mckee Ave, Finglas Dublin 11 | May 2025 | €393,000 | 293 m |
| 38 Heath Sq, Mckee Ave, Finglas Dublin 11 | Dec 2025 | €447,500 | 296 m |
| 17 Heath Sq, Finglas, Dublin 11 | Apr 2026 | €365,050 | 302 m |
| 77 Jamestown Rd, Finglas East, Dublin 11 | Sept 2025 | €488,000 | 321 m |
| 89 Clearstream Court, Mckee Ave, Finglas Dublin 11 | Jun 2025 | €445,000 | 323 m |
Nearby properties, not this site — a guide to local values.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received30 March 2026
- Decision due9 June 2026
- Decision issued1 July 2026
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Invalid80 m away
Planning permission for development at this site (2.61ha). The development will consist of alterations to the…
Building C, Jamestown Business Park, Finglas, Dublin 11
3269/22Dublin CityLodged 11 Feb 2022Industrial
- Granted80 m away
Planning permission for development at this site (2.61ha) at Building C, Jamestown Business Park, Finglas,…
Building C, Jamestown Business Park, Finglas, Dublin 11
3349/22Dublin CityLodged 23 Feb 2022Industrial
- Granted130 m away
Permission for development at a c. 2.83 hectare site at former Georgia Pacific Facility at McKee Avenue,…
Former Georgia Pacific facility, at McKee Avenue, Finglas, Dublin 11
3329/20Dublin CityLodged 7 Sept 2020Demolition
- Granted230 m away
Permission to install a 1.8m x 1.42m x 0.51m (HxWxL) above ground natural gas pressure reduction cabinet and…
Grass verge adjacent McKee Avenue, Finglas, Dublin 11
3794/22Dublin CityLodged 22 Apr 2022Infrastructure
- Granted250 m away
RETENTION: Retention of existing single storey shed to rear of house for use as garden office/ studio…
125, Jamestown Road, Finglas, Dublin 11
WEB1235/21Dublin CityLodged 10 Mar 2021Retention
- Granted250 m away
Proposed construction of a first floor extension at rear, internal alterations to existing dwelling and…
119 Jamestown Road,, Finglas,, Dublin 11
2403/18Dublin CityLodged 28 Feb 2018Extension
- Granted250 m away
RETENTION: Retention Permission to retain the new vehicle entrance in front boundary wall onto McKee Avenue
98, McKee Avenue, Finglas, Dublin 11
WEB1447/18Dublin CityLodged 30 Aug 2018Retention
- Granted280 m away
Permission for the demolition of existing single storey dwelling and garage due to fire damage and subsequent…
139, Jamestown Road, Dublin 11. D11 A7N3
3597/21Dublin CityLodged 29 Sept 2021New dwelling
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- GrantedApartments
We, Jamestown Village Limited, intend to apply for planning permission for development of a Large-scale…
Former factory site Finglas Business Centre, Jamestown Road, Finglas, Dublin 11
WEBLRD6066/25-S3Dublin CityLodged 20 May 2025
- GrantedApartments
7-year permission for a 'Large-Scale Residential Development' (LRD) at a site, principally comprising No. 86…
No. 86 and Nos. 90-96 Jamestown Road, Inchicore, Dublin 8
LRD6022/23-S3Dublin CityLodged 13 Jun 2023
- GrantedApartments
Permission (for a period of 10 years) for development on this site of c.3.79 hectares at the Royal Liver…
Royal Liver Assurance Retail Park, Old Naas Road, Dublin 12. The site is bounded by Kylemore Road (R112) to the west; Old Naas Road to the north; Naas Road (R810) to the south; and "Brooks" (Building Providers) to the east
4238/19Dublin CityLodged 18 Oct 2019
- RefusedApartments
Permission for a Large-Scale Residential Development (LRD) on a site, that includes lands at 'Harold's Bridge…
'Harold's Bridge Court, No.s 1-3 Clare Villas, No. 18 Greenmount Lane, and No. 11 Limekiln Lane, located at Harold's Cross Road, Greenmount Lane & Limekiln Lane, Harold's Cross, Dublin 6W.
LRD6036/24-S3Dublin CityLodged 9 Jan 2024
- GrantedApartments
Planning permission is sought for development at lands at Clongriffin, Dublin 13, on plots known as 3, 13 and…
Lands at Clongriffin, Dublin 13 on plots known as 3, 13 and 15, located to the south of Park Street, east of Friars' Street and north of Main Street (plot 3) to the north of Market Street, south of Dargam Sreet, east of Lake Street and west of Clongriffin
3894/19Dublin CityLodged 30 Aug 2019
- GrantedApartments
Permission for a Large Scale Residential Development LRD at No. 2 Firhouse Road and the former Morton's The…
No. 2 Firhouse Road and the former Morton’s The Firhouse Inn, Firhouse Road, Dublin 24, The site is also bound by Mount Carmel Park to the east
LRD26A/0001WSouth DublinLodged 22 Oct 2025
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.