Planning Permission Ireland
GrantedHousing estateDecided 25 February 2009

30, Whitehall Road, Churchtown, Dublin 14

Demolition of outbuildings, partial demolition and extension of an existing house, and construction of two new basement-level homes.

D08A/1102 · Dun Laoghaire Rathdown County Council · Lodged 29 January 2009

Reference
D08A/1102
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
29 January 2009

Summary

AI-generated

This development in Churchtown involves the partial demolition and major extension of an existing house to create a five-bedroom home over basement level. Additionally, two new detached four-bedroom, two-storey over basement dwellings will be constructed on the site.

Housing estatebasementextensionredevelopment
Residential units
2
Storeys
3

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Extensions and alterations to existing habitable dwelling and the construction of 2 no. Detached (4 bed) two storey over basement level dwellings of c. 246.7 m2 and c. 273.1m2 gfa. The development includes the demolition of attendant outbuildings (gfa c. 18.9m2), part demolition of the existing habitable dwelling (gfa c. 97m2) and extension of the existing habitable dwelling by c. 184.5m2 to develop a detached 5-bed two storey over basement level dwelling (gfa c. 367.5m2). There are balconies/ter...

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
32 Whitehall Road, Churchtown, Dublin 14Jan 2025€645,00036 m
2 Castle Court, Whitehall Road, ChurchtownApr 2025€663,00068 m
6 Whitehall Road, Churchtown, Dublin 14Apr 2026€820,000160 m
8 Berwick Hall, Whitehall Rd, Churchtown Dublin 14Apr 2026€720,000205 m
11 Berwick Hall, Churchtown, Dublin 14Sept 2025€630,000205 m
6 Berwick Hall, Churchtown, Dublin 14Feb 2025€250,000205 m
16 Berwick Hall, Churchtown, Dublin 14Oct 2025€535,000206 m
17 Berwick Hall, Churchtown, Dublin 14May 2025€570,000210 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received29 January 2009
  2. Decision issued25 February 2009
  3. Appeal submitted23 March 2009
  4. Appeal decided24 September 2009

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.