Planning Permission Ireland
RefusedHousing estateDecided 5 February 2016

Greythorn House, Glenageary Road Upper, Co. Dublin

Refurbishment of an existing house and construction of five new homes in Glenageary.

D15A/0774 · Dun Laoghaire Rathdown County Council · Lodged 3 December 2015

Reference
D15A/0774
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
3 December 2015

Summary

AI-generated

The development consists of internal and external alterations to refurbish an existing five-bedroom house. Additionally, five new two-storey dwellings will be built on the site, including attached, detached, and semi-detached units.

Housing estaterefurbishmentinfillhousing
Residential units
5
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission for development consisting of internal and external alterations to existing dwelling, to refurbish existing two storey over basement 5 bedroom dwelling house, and for the provision of 5 no. New two storey dwellings (in addition to the existing house) comprising 2 no. 202m2 four bedroom dwelling houses attached to either side of the existing dwelling, 1 no. Detached 119m2 two bedroom dwelling, 1 no. Semi-detached 119m2 two bedroom dwelling and 1 no. 130 m2 3 bedroom semi detached d...

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 26 July 2017.

4 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Beechgrove, Lower Glenageary Rd, DublinJul 2025€1,200,00087 m
4 Beechwood Grove, Blanchardstown, Dublin 15price excludes VATJun 2026€488,98699 m
13 Sallynoggin Villas, Glenageary, DublinFeb 2026€680,000102 m
3 The Lodge, Kylemore, Church Roadprice excludes VATJul 2025€524,229105 m
Soubirous, Lower Glenageary Rd, GlenagearyMar 2026€851,000106 m
3 Glenageary Woods, Glenageary, DublinMar 2026€1,005,000132 m
10 Beechwood Grove, Dun Laoghaire, Co DublinDec 2025€1,350,000147 m
Glenville, Glenageary Rd Lower, Dun LaoghaireMay 2026€4,125,000169 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received3 December 2015
  2. Decision issued5 February 2016
  3. Appeal submitted3 March 2016
  4. Appeal decided6 July 2016

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.