Planning Permission Ireland
GrantedNew dwellingDecided 23 February 2011

Rear of 10, Prince Edward Terrace, Carysfort Avenue, Blackrock, Co. Dublin (Off Brookfield Terrace)

Construction of two terraced mews houses to the rear of a protected structure.

D10A/0297 · Dun Laoghaire Rathdown County Council · Lodged 28 January 2011

Reference
D10A/0297
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
28 January 2011

Summary

AI-generated

The project involves building two two-storey terraced mews houses. The south unit will be a 150 sqm 3-bedroom house with a balcony, and the north unit will be a 142 sqm 2-bedroom house with a terrace and solar panels.

New dwellingmewssolarresidential
Residential units
2
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission is sought for development to a protected structure which will consist of the construction of 2 no. Two-storey terraced mews houses. South unit to be a 150m2 3-bedroom unit and to have 5.5m2 first floor balcony to brookfield terrace. North unit to be a 142m2 2-bedroom unit with a 13m2 terrace at first floor level to the garden side. Dwellings to have vaulted metal-clad roofs with flat-roofed mid-sections featuring 6m2 of angled solar panels per dwelling.

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
10b 'loreto', Rear Of Prince Edward Terrace, BlackrockJun 2025€1,300,0004 m
27 Brookfield Court, Brookfieldprice excludes VATDec 2025€339,16278 m
25 Brookfield Court, Brookfield, Kilbarryprice excludes VATDec 2025€333,32692 m
24 Brookfield Court, Brookfieldprice excludes VATNov 2025€330,35292 m
90 Brookfield Court, Brookfield, Kilbarryprice excludes VATJan 2026€330,35292 m
23 Brookfield Court, Brookfield, Kilbarryprice excludes VATJan 2026€347,97492 m
21 Brookfield Court, Brookfield, Kilbarryprice excludes VATDec 2025€509,53892 m
22 Brookfield Court, Brookfield, Kilbarryprice excludes VATDec 2025€343,56892 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received28 January 2011
  2. Decision issued23 February 2011

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.