Planning Permission Ireland
GrantedChange of useDecided 12 December 2016

Spirit Premium Motors, Unit T14, Maple Avenue, Stillorgan Industrial Estate, Sandyford, Dublin 18

Conversion of a motor workshop and offices into a motor retail showroom with new glazing and signage.

D16A/0769 · Dun Laoghaire Rathdown County Council · Lodged 20 October 2016

Reference
D16A/0769
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
20 October 2016

Summary

AI-generated

Permission is sought to convert an existing motor servicing workshop and store into a 362 sqm motor retail showroom. The project also includes converting first-floor offices and extending the mezzanine to create a 244 sqm showroom space, alongside new glazing and signage.

Change of useshowroomcommercialchange of use
Floor area
606 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission is sought for
  • Conversion of existing motor servicing workshop and store to motor retail showroom (total area 362.0 sq. M)
  • Part conversion of existing first floor offices and internal extension of existing mezzanine to form motor retail showroom at first floor level (total area 244.0 sq. M)
  • Alterations to existing showroom windows at ground floor level to the south facing elevation and new two storey showroom window to the east facing elevation
  • New building signage and

Land-use zoning

What this land is zoned for

Objective LIWWD
LIW To improve and provide for low density warehousing-light industrial warehousing uses.

National zoning type: Warehouse (excluding retail warehouse)

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 25 April 2017. A completion certificate was lodged on 30 April 2018.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
504 The Edges, Beacon South Quarter, SandyfordNov 2025€390,00068 m
506 The Edges 2, Beacon South Quarter, SandyfordApr 2025€385,00068 m
509 The Edges Two, Beacon South Quarter, Sandyford Dublin 18Jul 2025€465,00068 m
410 The Edges 2, Beacon South Quarter, SandyfordOct 2025€428,00068 m
401 The Edges 2, Beacon South Quarter, Sandyford Ind Est Dublin 16Jan 2025€391,00068 m
508 The Edges 2, Beacon South Quarter, Sandyford Dublin 18Nov 2025€442,00068 m
Apt 408 The Edges 1, Beacon South Quarter, Blackthorn Rd Dublin 18May 2025€332,00085 m
Apt 614 The Edges 1, Beacon South Quarter, Sandyford Dublin 18May 2025€485,00085 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 October 2016
  2. Decision issued12 December 2016

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.