Planning Permission Ireland
RefusedChange of useDecided 2 February 2022

Airton House, Airton Road, Tallaght, Dublin 24

Change of use of a vacant office building in Tallaght to a motor showroom and workshop.

SD21A/0326 · South Dublin County Council · Lodged 30 November 2021

Reference
SD21A/0326
Authority
South Dublin County Council
Register status
Decided
Type
Permission
Received
30 November 2021
Floor area
1343 m²

Summary

AI-generated

Permission is sought to convert an uncompleted and vacant office building into a 1,300 sq.m motor showroom and service workshop. The works include partial demolition of existing structures, elevation alterations, and a new 90 sq.m single-storey rear extension.

Change of usecommercialshowroomrenovation
Storey
1

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Change of use of existing uncompleted and vacant office building to motor showroom and service workshop use (1300sq. M) with ancillary office, staff and customer accommodation; removal of existing projecting porch and stairwell at ground floor level (16sq. M); removal of section of existing floor and projecting stairwell (927sq. M) at first floor level; alterations to existing elevations to include for new glazed curtain walling and insulated wall cladding; new attached illuminated building signage; construction of new single storey extension (90sq. M) to rear to form part of new service workshop; all associated drainage and site works.

Land-use zoning

What this land is zoned for

REGENRE
To facilitate enterprise and/or residential led regeneration

National zoning type: Mixed Use, general development, opportunity/proposal site

Objective set by the South Dublin County Development Plan 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 17 February 2025.

Notified floor area: 2,346

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
45 Tramway Court, Old Blessington Rd, Tallaght Dublin 24May 2025€110,000464 m
46 Tramway Court, Old Blessington Rd, Tallaght Dublin 24May 2025€110,000464 m
51 Tramway Court, Old Blessington Rd, Tallaght Dublin 24Oct 2025€193,000464 m
44 Tramway Court, Old Blessington Rd, Tallaght Dublin 24Nov 2025€170,000464 m
38 Tramway Court, Old Blessington Road, TallaghtApr 2026€246,000464 m
74 Bancroft Ave, Tallaght, Dublin 24Nov 2025€540,000479 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received30 November 2021
  2. Decision due2 February 2022
  3. Decision issued2 February 2022

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.