Planning Permission Ireland
GrantedExtensionDecided 31 July 2019

12 Anglesea Avenue, Blackrock, Co Dublin A94 K0D4

Demolition of existing extensions, construction of a new rear and side extension, attic conversion, and widened driveway entrance.

D19A/0384 · Dun Laoghaire Rathdown County Council · Lodged 6 June 2019

Reference
D19A/0384
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
6 June 2019

Summary

AI-generated

The project involves demolishing a 20 sqm rear and side extension to build a larger 43 sqm single-storey extension. It also includes a new side gable wall, a rear dormer for an attic conversion, internal alterations, and widening the vehicular entrance from 2.4m to 4.5m.

Extensionextensionattic conversiondemolitiondriveway

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for
  • Demolition of existing rear and side extension to existing house (c. 20 sqm)
  • Construction of single storey extension to the rear and side of the existing house (c. 43 sqm extension)
  • New gable wall to side with roof adjusted, dormer to the rear and attic conversion
  • Internal alterations
  • Widening of existing vehicular entrance off anglesea avenue (existing 2.4m, proposed 4.5m) and all associate site works

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 16 November 2020.

Notified floor area: 39

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
9 Anglesea Ave, Blackrock, DublinNov 2025€1,510,00034 m
4 Anglesea Ave, Blackrock, DublinDec 2025€1,360,00036 m
23 Convent Rd, Dalkey, DublinJun 2026€650,00089 m
3 Avoca Place, Blackrock, DublinDec 2025€671,000103 m
16 Avoca Place, Blackrock, Dublinnot full market priceSept 2025€500,000107 m
9 Avoca Place, Blackrock, DublinJul 2025€1,250,000126 m
12 Brookfield Ave, Blackrock, DublinSept 2025€485,000153 m
10 Green Rd, Blackrock, DublinOct 2025€820,000187 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received6 June 2019
  2. Decision issued31 July 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.