Planning Permission Ireland
GrantedAlterationsDecided 23 November 2023

9, Corrig Avenue, Dun Laoghaire, Dublin, A96V6H3

External and internal alterations, solar panels, and refurbishment of a protected structure.

D23A/0536 · Dun Laoghaire Rathdown County Council · Lodged 7 November 2023

Reference
D23A/0536
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
7 November 2023

Summary

AI-generated

The development includes external alterations to rear openings, new terraced access to the garden, relocation of vehicular gates, and new solar panels on the rear roof. Internal layout changes, insulation, and general conservation repairs will also be carried out on this protected structure.

Alterationsheritagesolarrenovation

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Proposed external alterations to include alterations to existing opes to rear at lower ground and upper ground level and at sides of rear return, replacement of non-original glazing, internal insulation, new terraced access from rear return to garden, new store, relocation of vehicular access gates from side to front garden with provision of new gates to front, new conservation style rooflights to rear. New photovoltaic panels to roof rear, internal alterations including changes to internal layouts, provision of internal insulation, new ensuites at first floor level, replacement of sanitary ware and new kitchen fittings, replacement of services and general refurbishment and repairs as required to include all associated conservation and ancillary site works. A protected structure.

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
10 Corrig Ave, Dun Laoghaire, DublinNov 2025€1,286,25019 m
The Coach House, Sydenham Mews, Corrig AvenueJan 2026€750,00033 m
34 Northumberland Avenue, Dunlaoughaira, Co DublinDec 2025€1,900,00091 m
Apartment 2, Brook House, Corrig AvenueFeb 2025€462,000102 m
5 Brook House, Corrig Avenue, Dun LaoghaireAug 2025€450,000102 m
15 Northumberland Ave, Dun Laoghaire, DublinMay 2025€1,250,000117 m
3 Dungar Terrace, Dun Laoghaire, Co. DublinNov 2025€950,000136 m
Apt 24, Adelphi House, Upper Geogres StreetJan 2025€590,000136 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 November 2023
  2. Decision due4 December 2023
  3. Decision issued23 November 2023
  4. Permission expiry18 December 2026

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.