Planning Permission Ireland
GrantedExtensionDecided 30 October 2025

Lis Na Carrig, 34A Coliemore Road, Dalkey, Dublin, A96HN83

Extension and refurbishment of a split-level house, including a new basement, green roofs, and solar panels.

D25A/0693/WEB · Dun Laoghaire Rathdown County Council · Lodged 5 September 2025

Reference
D25A/0693/WEB
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
5 September 2025

Summary

AI-generated

The project involves the extension and remodelling of an existing split-level house to create a four-bedroom home. Works include a new partial basement, single and two-storey extensions, green roofs, solar panels, and works abutting a protected structure.

Extensionextensionbasementgreen roofsolar
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • The extension, refurbishment and internal remodelling of the existing two-storey, split level 3 bedroom house on the site to create a 4 bedroom, two storey split-level dwelling, over a new partial basement to the rear comprising
  • The construction of a single storey flat roof extension at basement level to the rear (east) with a terrace deck on the roof and staircase to the rear garden
  • The reconstruction and extension of the existing single storey extension at the side (south) abutting queenstown castle (protected structure: rps 1544) including single storey extensions to the front (west) to provide a lightwell and to the rear (east) and the replacement of the existing roof with a green roof and parapet walls over the extended floor area
  • The construction of two storey extensions to the front (west) and rear (east) of the existing two storey element of the house and the introduction of 2 no. Balconies to the rear (east) at the first floor
  • The replacement of the roof of the existing two storey element of the house with a green roof with parapet walls of the same height of the proposed front and rear extensions and the installation of solar pv panels
  • The construction of a raised terrace adjacent to the extended kitchen at ground floor level to the rear (east)
  • The construction of a single storey bicycle store
  • The widening of the existing vehicular entrance onto the access to queenstown castle (protected structure: rps 1544), from 3.2 metres to 4.6 metres and the introduction of a pedestrian gate; and
  • All other site development works required to facilitate the development including hard and soft landscaping

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Nirvana, Coliemore Road, DalkeyFeb 2025€2,500,00063 m
1 Berwick House, Coliemore Road, DalkeyMay 2025€770,00064 m
Landfall, Green Rd, Dalkey Dublin 1Oct 2025€3,175,000221 m
Lilliput, Sorrento Rd, DalkeyJan 2025€571,040248 m
E5 Coliemore, Coliemore Rd, DalkeyJun 2026€800,000258 m
18 Sorrento Court, Sorrento Rd, DalkeyApr 2026€585,000325 m
20 Sorrento Court, Sorrento Rd, DalkeyMay 2026€628,000325 m
13 Vico Rock, Sorrento Rd, DalkeyJan 2025€460,000329 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received5 September 2025
  2. Decision due30 October 2025
  3. Decision issued30 October 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.