Planning Permission Ireland
GrantedExtensionDecided 22 July 2025

2, Temple Park Avenue, Blackrock, Dublin, A94T9Y8

Rear extensions at ground and first floor, roof alterations, and internal floor level changes.

D25B/0309/WEB · Dun Laoghaire Rathdown County Council · Lodged 3 June 2025

Reference
D25B/0309/WEB
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission
Received
3 June 2025

Summary

AI-generated

The project involves replacing the curved roof of the existing side extension with a matching hipped roof and lowering the rear ground floor level. It also includes constructing a new ground floor flat-roofed rear extension and a first-floor rear extension to the master bedroom.

Extensionextensionrenovation
Storeys
2

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Removal of curved roof to existing 2-storey side extension and replacement with hipped roof to match existing, increase in height of 280mm . Removal of ground floor bay window to rear of existing side extension and replacement with flat window within existing opening. Reduction in floor level of 280mm to rear of ground floor side extension and existing rear floor level. New ground floor flat roofed extension to rear of house incorporating living/dining/kitchen area, 280mm below existing ffl. First floor extension to rear to master bedroom. All associated site works and landscape works.

Land-use zoning

What this land is zoned for

Objective ARS
A To provide residential development and improve residential amenity while protecting the existing residential amenities

Objective set by the COUNTY DEVELOPMENT PLAN 2022-2028 (2022–2028). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
St Marys, Tobernea Terrace, Seapoint AveFeb 2026€620,00055 m
11 Seapoint Court, Blackrock, Co Dublinnot full market priceMar 2026€19,29681 m
14 Seapoint Court, Temple Crescent, BlackrockAug 2025€580,00081 m
7 Temple Park Ave, Blackrock, DublinJun 2026€1,440,00089 m
7 Seapoint Court, Temple Crescent, BlackrockMay 2025€530,00099 m
Carrig Rua, Temple Crescent, BlackrockFeb 2026€1,500,000107 m
4 Seapoint Court, Temple Crescent, BlackrockAug 2025€440,000114 m
3 Seapoint Ave, Blackrock, DublinSept 2025€2,315,000144 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received3 June 2025
  2. Decision due28 July 2025
  3. Decision issued22 July 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.