Planning Permission Ireland
GrantedCommercialDecided 3 December 2019

Cherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .

Installation of three elevated meeting pods with wind turbines and solar panels, plus a central canopy.

DZ19A/0255 · Dun Laoghaire Rathdown County Council · Lodged 7 November 2019

Reference
DZ19A/0255
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Permission (SDZ)
Received
7 November 2019

Summary

AI-generated

Permission is sought for three elevated single-storey meeting pods equipped with microgeneration wind turbines and solar panels, accessed via pedestrian bridges. The project also includes a 320 sqm canopy and facade alterations.

Commercialsolarwind turbineofficecherrywood
Storey
1
Floor area
84 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development consisting of
  • Provision of 3 no. Single-storey meeting pods (each measuring 28 sqm and c. 4.3m in height), elevated between 3.5m and 5.3m above ground, with rooflevel microgeneration wind turbines and solar panels, accessible via individual pedestrian bridges, all located to the east of pond 4
  • Erection of a 320 sqm canopy measuring 7m above ground level at its highest point, centrally located between buildings 2, 3, 4, and 5
  • Alterations to selected facad

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 26 March 2020. A completion certificate was lodged on 20 June 2023.

Notified floor area: 20

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Glen Burnie, Cherrywood Rd, Loughlinstown Dublin 18Jul 2025€783,000181 m
18 Mercer Manor, Tully Village Centre West, Cherrywoodprice excludes VATMay 2026€440,367198 m
11 Tullyvale Crescent, Cherrywoodprice excludes VATFeb 2026€612,334198 m
16 Tullyvale Crescent, Cherrywoodprice excludes VATFeb 2026€792,952198 m
Apartment 17 Block F, Domville Crescent, Cherrywoodprice excludes VATMar 2026€453,744198 m
8 Tullyvale Close, Cherrywoodprice excludes VATApr 2026€634,361198 m
Apartment 711 Block F, Domville, Cherrywoodprice excludes VATApr 2026€414,097198 m
25 Mercer Manor, Tully Village Centre West, Cherrywoodprice excludes VATMay 2026€347,136198 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received7 November 2019
  2. Decision issued3 December 2019

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.