Planning Permission Ireland
GrantedCommercialDecided 30 April 2025

Cherrywood Business Park (lands including & adjoining Bldgs 2-5 & 7 & basement level under Buildings 3, 4 & 5, Pond 4 & part of the linear park), Cherrywood, Co Dublin .

Extension of duration for meeting pods, a canopy, facade alterations, and landscaping works at Cherrywood Business Park.

DZ19A/0255/E · Dun Laoghaire Rathdown County Council · Lodged 13 March 2025

Reference
DZ19A/0255/E
Authority
Dun Laoghaire Rathdown County Council
Register status
Decided
Type
Extension Of Duration Of Permission
Received
13 March 2025

Summary

AI-generated

The development includes three elevated single-storey meeting pods with microgeneration wind turbines and solar panels. It also features a 320 sqm canopy, alterations to building facades, and extensive landscaping works including a sunken garden and pedestrian connections.

Commercialsolarwindcommerciallandscaping
Storey
1
Floor area
84 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

  • Permission for development consisting of
  • Provision of 3 no. Single-storey meeting pods (each measuring 28 sqm and c. 4.3m in height), elevated between 3.5m and 5.3m above ground, with rooflevel microgeneration wind turbines and solar panels, accessible via individual pedestrian bridges, all located to the east of pond 4
  • Erection of a 320 sqm canopy measuring 7m above ground level at its highest point, centrally located between buildings 2, 3, 4, and 5
  • Alterations to selected facades of buildings 2, 3 and 4
  • Landscaping works including inter alia: (a) the provision of a sunken garden located between buildings 2, 3, 4 and 5, including stairs and a lift and a new connection to basement level, (b) provision of stairway from the business park (between buildings 3 and
  • To the linear park, (c) improvement of part of the linear park, including landscaping grading, planting, pedestrian and cycle routes to connect to existing and previously permitted (reg. Ref. Dz17 a/0122 and dz18a/1104) paths, (d) associated hard and soft landscaping works, including works in the vicinity of pond 4
  • Provision of welfare facilities at basement level (increasing the basement floor area by 4.1 sqm)
  • Construction of a new vehicle access/egress ramp located to the north of building 3, which will result in modifications to the basement level layout, including the reduction of 9 no. Car parking spaces at basement level
  • Modifications to the existing access/egress ramp located to the north-east of building 4 to provide for cyclist use only
  • Alterations to existing traffic circulation and car parking layout at surface level, resulting in the reduction in 24 no. Car parking spaces at surface level
  • Provision of bicycle stands and shelters at surface level
  • Removal of 4 no. Existing signs and the erection of 16 no. Internally illuminated signs (6 no. Single sided signs ranging in size from 0.62 sqm to 23.73 sqm; and 10 no. Double sided signs (ranging in size from 2.48 sqm to 6.84 sqm)
  • Upgrade of existing public lighting
  • Changes to levels, notably to the east of pond 4 where additional fill is proposed to create viewing areas and access to proposed meeting pods
  • Diversion of services (mechanical and electrical, water supply, communications, gas, sewage disposal and surface water disposal)
  • Provision of sustainable urban drainage systems, including bioretention areas and rain gardens
  • All associated site development works above and below ground. The proposed development is located on a site of approximiately 4.28ha (with a devlopment area of 1.52ha) within the cherrywood strategic development zone (sdz) and is subject to the cherrywood planning scheme 2014 (as amended}

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
Glen Burnie, Cherrywood Rd, Loughlinstown Dublin 18Jul 2025€783,000173 m
7 Cherrywood Park, Cherrywood, LoughlinstownJan 2025€585,000193 m
148 Gleann Na Ri, Cherrywood, Dublin 18Jul 2025€501,000205 m
8 Tullyvale Close, Cherrywoodprice excludes VATApr 2026€634,361206 m
11 Tullyvale Crescent, Cherrywoodprice excludes VATFeb 2026€612,334206 m
Apartment 17 Block F, Domville Crescent, Cherrywoodprice excludes VATMar 2026€453,744206 m
16 Tullyvale Crescent, Cherrywoodprice excludes VATFeb 2026€792,952206 m
Apartment 711 Block F, Domville, Cherrywoodprice excludes VATApr 2026€414,097206 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received13 March 2025
  2. Decision due7 May 2025
  3. Decision issued30 April 2025

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.