Terminal 1, Dublin Airport, Collinstown, Co.Dublin
Rooftop plant room extension at Dublin Airport Terminal 1.
F23A/0104 · Fingal County Council · Lodged 15 March 2023
- Reference
- F23A/0104
- Authority
- Fingal County Council
- Register status
- Decided
- Type
- Permission
- Received
- 15 March 2023
Summary
AI-generatedThe daa plc is seeking permission to build a 185 sqm extension to the existing rooftop plant room on the T1X building. This will accommodate mechanical equipment, including extract and roof cowls, to serve a new food and beverage unit on the Departures Level.
- Floor area
- 185 m²
Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.
Official record
Development description
- Daa plc intend to seek planning permission for development at a site of c. 361.5m2 on the north-western part of the roof ( level
- Of the t1x building at terminal 1, dublin airport, collinstown, co. Dublin. The proposed development will consist of an extension to the existing rooftop plant room to provide a rooftop plant unit of c. 185m2. The proposed development will accommodate additional mechanical equipment, including 2no. Extract cowls, ducting , and 3no. Roof cowls, all to serve a new food and beverage unit inside the t1x building on the departures level (level
- , and will be screened with a louvre cladding to match the existing rooftop plant room in terms of elevational treatment and height. An external condenser unit is also proposed to be located immediately to the north-west of the proposed plant room extension
Land-use zoning
What this land is zoned for
“Ensure the efficient and effective operation and development of the airport in accordance with an approved Local Area Plan”
Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.
Read the zoning objectives in the development planBuilt & sold
What happened next
Beyond the decision: whether this development was built, and what property here has sold for.
Built — construction complete
A commencement notice records works starting on 2 August 2019. A completion certificate was lodged on 26 June 2025.
Notified floor area: 73.7 m²
5 commencement notices are linked to this development.
Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.
Key dates
Timeline
- Application received15 March 2023
- Decision due9 May 2023
- Decision issued28 April 2023
In the area
Applications near this site
Other planning applications within about 500 m — what else is being proposed or built nearby.
- Granted30 m away
Development at a site at the Immigration Hall serving Pier 1 and Pier
Terminal 1, Dublin Airport, Collinstown, Co. Dublin
F19A/0049FingalLodged 16 May 2019Infrastructure
- Granted30 m away
Amendment to Planning Permission reference F19A/0049 as granted which
Terminal 1, Dublin Airport, Co. Dublin.
F20A/0262FingalLodged 8 Jun 2020Alterations
- Granted80 m away
The erection of a solar photovoltaic (PV) array on the northern end of
Terminal 1, Dublin Airport, Co. Dublin.
F16A/0167FingalLodged 22 Apr 2016Energy
- Granted100 m away
Construction of a detached ticket sales kiosk loacted on footpath betw
Dublin Airport, Swords, Co. Dublin
F22A/0411FingalLodged 9 Aug 2022Commercial
- Granted110 m away
Erection of 1 no. backlit advertising sign to be affixed to the facade
Lobby 2, Terminal 1, Terminal 1 Arrivals Road, Dublin Airport, Co. Dub
F14A/0149FingalLodged 14 Apr 2014Commercial
- Granted130 m away
The construction of a passenger segregation facility at Pier 2, compri
Pier 2, Dublin Airport, Co. Dublin.
F16A/0046FingalLodged 16 Feb 2016Infrastructure
- Granted150 m away
The erection of a jet-blast screen on the airfield apron between Piers
Dublin Airport, Co. Dublin
F11A/0369FingalLodged 11 Oct 2011Infrastructure
- Granted170 m away
The installation of a new facade and thermal envelope to all elevation
Terminal 1, Dublin Airport, Collinstown, Co. Dublin
F20A/0553FingalLodged 9 Mar 2021Infrastructure
Related developments
Similar applications
Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.
- InvalidInfrastructure
DAA PLC intends to apply for Permission for development at this site (c. 0.19 Ha), at Dublin Airport,…
Dublin Airport, Terminal 1 Arrivals, Terminal Complex, Collinstown, Swords, Co. Dublin
F24A/0792EFingalLodged 4 Sept 2024
- GrantedCommercial
Permission to amend a previous permitted development (Fingal County Council reg ref F21A/0255) located at…
Site A- Hotel Site adjoins the T2 Multi-Storey Car Park to the north, Dublin Airport, townland of, Corballis, Co. Dublin.
F23A/0707FingalLodged 20 Nov 2023
- GrantedInfrastructure
We, daa plc, intend to apply for a temporary 7-year permission for a proposed development at 2no. landside…
2no. landside sites, in the townlands of Collinstown, Co. Dublin Airport, Co. Dublin
F24A/0309EFingalLodged 4 Apr 2024
- RefusedDemolition
Planning Permission is sought for the demolition of the 2no. concrete spiral ramps which provide vehicular…
Spiral Ramps, Terminal 1, Dublin Airport, Collinstown, Co. Dublin, K67 P957
F25A/0011EFingalLodged 10 Jan 2025
- GrantedCommercial
The development will consist of the installation of a new facade and thermal envelope to all elevations of…
Terminal 1, Dublin Airport, Collinstown, Co. Dublin
F20A/0553/E1FingalLodged 1 May 2026
- GrantedCommercial
Alterations, extension and upgrades to the existing terminal building and all ancillary site development…
Weston Airport, Backweston Park, Leixlip, Dublin, W23 XHF8
SD22A/0345South DublinLodged 10 Jan 2023
Community
Discussion
What local people think about this application.
Community sentiment
No votes yetNobody has voted on this application yet.
Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.
Sign in to have your say on this application.
No comments yet. Be the first to say what you think about this application.
Sign in to join the discussion on this application.
Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.