Planning Permission Ireland
GrantedCommercialDecided 23 January 2024

Site A- Hotel Site adjoins the T2 Multi-Storey Car Park to the north, Dublin Airport, townland of, Corballis, Co. Dublin.

Internal and layout alterations to a permitted hotel at Dublin Airport.

F23A/0707 · Fingal County Council · Lodged 20 November 2023

Reference
F23A/0707
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
20 November 2023

Summary

AI-generated

Permission is sought for alterations to a previously permitted hotel development at Site A. The changes include reconfiguring the internal layout from ground to eleventh floor levels, affecting bedrooms, reception, meeting rooms, restaurant, and leisure facilities.

Commercialhotelairportalterations
Storeys
12

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

Permission to amend a previous permitted development (fingal county council reg ref f21a/0255) located at dublin airport. The development proposed under the subject application relates specifically to site a - hotel site. The development permitted on site b, site c and site d is unaffected by this planning application. The proposed development, which provides for alterations to the permitted hotel development, comprises: the reconfiguration of the internal layout of all levels of the permitted building (from ground to eleventh floor levels), to include amendments to the hotel bedrooms and related ancillary hotel facilities including entrance lobbies and reception spaces, meeting rooms, event / business space (with ancillary related spaces and public bar), administration, security office and staff facilities, restaurant with bar (and ancillary related spaces), leisure centre (including reception area and related facilities such as changing rooms, gym, treatment rooms, sauna, steam room and vitality room), toilets, waste storage area, bicycle store, ancillary space (which includes areas such as circulation cores (lifts and stairs) and routes, plant areas and storage areas throughout the building, electrical substations and switchrooms, toilets and shower areas etc. ), and the omission of the permitted children's play room (kids club) and private dining area alterations to the eleventh floor level's public bar's and executive lounge's south facing terrace; an increase in the size of the permitted retail unit by 9 sq m - from c. 188 sq m permitted to c. 197 sq m proposed) ; alterations to the permitted building's elevations; alterations to the permitted plant areas at eleventh floor level and at roof level (and associated relocation of the roof plant screen, where required), including the relocation of the permitted weather radome and associated equipment room at roof level; and associated alterations to permitted hard and soft landscaping and permitted scheme's site services (mechanical and electrical, water supply, sewage disposal and surface water disposal), all on a proposed larger site area of 0.4859 for site a (0.4715 ha permitted). The development also consists of the provision of a dedicated covered one-way service route to the rear of the permitted building at ground floor level, with associated automatic security roller shutters, intercom pillar and service area. Service route and yard access will be via the existing terminal 2 multi storey car park access road, with egress will be via the terminal 2 multi storey car park exit road in the west. The permitted designated drop-off / layby at the front of the hotel continues to be provided. The proposed development results in an increase in the permitted building's height (excluding weather radome) (from c. 41.5m permitted to c. 41.8m proposed) and alterations to the permitted extents of the building floorplates. The proposed development also results in an increase in the gross floor area of the permitted ground, second and eleventh floor levels by c. 353 sq m in total (from c. 6,804 sq m floor area total permitted across these levels, to c. 7,157 sa m floor area total proposed across these levels), and a decrease in the size of the permitted first floor level by c. 5 sq m gross floor area (from c. 3,101 sq m floor area total permitted, to c. 3,096 sa m floor area total proposed) (there is no change proposed to the permitted gross floor areas of the third, fourth, fifth, sixth, seventh, eighth, ninth and tenth floor levels (c. 2,384 sq m floor area for each level or c. 18,784 sq m in total permitted)). The total gross floor area of the hotel building increases by c. 348 sq m (from c. 28,689 sq m permitted to c. 29,037 sq m proposed) with an increase in the number of hotel bedrooms from 410 no. Permitted to 412 no. Proposed. ;site b - skybridge house (former tasc building), dublin airport, townland of collinstown, co. Dublin; site c - site compound 1 is bounded by the t2 departure road to the west and t2 multi-storey car park to the east, dublin airport, townland of corballis, co. Dublin; and site d - site compound 2 is located to the east of swords rugby club in the townland of stockhole, co. Dublin.

Land-use zoning

What this land is zoned for

DA - Dublin AirportTU
Ensure the efficient and effective operation and development of the airport in accordance with an approved Local Area Plan

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Built & sold

What happened next

Beyond the decision: whether this development was built, and what property here has sold for.

Built — construction complete

A commencement notice records works starting on 26 June 2024. A completion certificate was lodged on 15 April 2025.

Notified floor area: 716

2 commencement notices are linked to this development.

Recent sales nearby

within 500 m
Residential Property Price Register sales within 500 metres of this site
AddressDatePriceDistance
San Antoine, Corballis, Cloghrannot full market priceJul 2025€200,000364 m

Nearby properties, not this site — a guide to local values.

Sources: Building Control Management System (commencement notices) and the Residential Property Price Register, licensed under CC BY 4.0. Records are matched to this application by location and may not be exhaustive; always confirm against the official source before relying on them.

Key dates

Timeline

  1. Application received20 November 2023
  2. Decision due23 January 2024
  3. Decision issued23 January 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.