Planning Permission Ireland
GrantedInfrastructureDecided 14 June 2024

Site between Hanger 5 and M50 garage, North Apron airside support, Dublin Airport, Castlemoate road, Corballis, Swords, Co. Dublin

Construction of a two-storey airside operations building and a temporary maintenance centre at Dublin Airport.

F23A/0786 · Fingal County Council · Lodged 20 May 2024

Reference
F23A/0786
Authority
Fingal County Council
Register status
Decided
Type
Permission
Received
20 May 2024

Summary

AI-generated

The development consists of a two-storey airside operations building of 1,698 square metres to accommodate an emergency passenger reception centre and support facilities. It also includes a temporary two-storey north apron line maintenance centre of 1,910 square metres, which will eventually be removed.

Infrastructureairportinfrastructurecommercial
Storeys
2
Floor area
3,608 m²

Generated from the description above by an AI model and may contain mistakes. The council’s description is the authoritative record.

Official record

Development description

The development will consist of: a 2 -storey airside operations building of c. 1,698 sq. M and c. 8.4m in height (max. Height of c. 9.5m including plant) accommodating a passenger reception centre for airside emergency incidents and primary support function for the airport to include operations, maintenance and storage facilities required for the airfield's foreign object debris and snow bases. The building will include an open sided area for the parking of hgv''s and to store equipment. A new gate will be provided to the compound of the airside operations building to the south within the security restricted area fence line, enabling emergency vehicles direct access, a 2 storey north apron line maintenance centre building of c. 1,910 sq. M and c. 7.3m in height providing a temporary facility accommodating airside workshops and stores at ground level and offices above. Following the completion of longer-term facilities at the north apron the centre will be removed and the hardstanding will be reused for airside ground servicing equipment storage and staging areas; foreign object debris airside infrastructure to include above-ground potassium acetate tanks, fuel tank, skip and container area and tipping ramps; airside parking areas with electric vehicle (ev) charging stations for buses and cars; and a new generator room of c. 107sq. M and 3.9m in height housing electrical equipment. The development will also include site clearance airside north of the critical part of security restricted area boundary and demolition of existing smoking shelter, c. 4.4sq. M and provision of hard-standing areas, smoking shelter, landscaping, fencing and gates, lighting (up to 30m in height), utilities, ancillary parking, external snow base parking, drainage and attenuation systems and all associated site works. Ai rcvd 20/05/24

Land-use zoning

What this land is zoned for

DA - Dublin AirportTU
Ensure the efficient and effective operation and development of the airport in accordance with an approved Local Area Plan

Objective set by the The Fingal Development Plan 2023 – 2029 (2023–2029). The planning authority decides each application on its own merits — this is the zoning context, not a compliance assessment.

Read the zoning objectives in the development plan

Key dates

Timeline

  1. Application received20 May 2024
  2. Decision due14 June 2024
  3. Decision issued14 June 2024

In the area

Applications near this site

Other planning applications within about 500 m — what else is being proposed or built nearby.

Related developments

Similar applications

Ranked by what these developments actually propose, not by matching words — so you can see how comparable applications were decided.

Community

Discussion

What local people think about this application.

Nobody watching yet

Community sentiment

No votes yet

Nobody has voted on this application yet.

Community sentiment — a straw poll of people who visited this page, not a statutory submission. To make a valid observation you must submit it to the planning authority.

Sign in to have your say on this application.

No comments yet. Be the first to say what you think about this application.

Sign in to join the discussion on this application.

Comments are moderated and are the opinions of the people who wrote them. They form no part of the statutory planning process — to make a valid observation you must submit it to the planning authority.